6
9
Finally add the completed assembly into the route holes of the first post.
10
Insert the completed fence panel into the route holes of the second
fence post. Plumb and level the post and add concrete according to
manufacturers instructions.
11
Check to ensure the second Post is level , then measure panel plus add dimensions
from center of 2nd post to center of next and dig the third post hole accordingly.
Center to Center Post Distance