background image

#0-313A-SBA  (6/01) 
Page 6 of 14 pages 
BARRETT CENTRIFUGALS INC. 
1-800-228-6442 

  The safety lid latch circuit is designed to prolong the life of the solenoid and improve initial 

pick-up force.  This is accomplished by providing a ½ second burst of 24-volt DC power to 
the coil, then cutting back to approximately 12 volts DC.  The voltage reduction circuit can 
be by-passed at any time by pushing the 

STOP

 push button.  

 

  Should the solenoid pin become stuck ‘down’ due to locking lever interference, move the 

lever slightly to free the pin and press the 

STOP

 push button momentarily. To prevent this 

problem, 

do not jam the locking lever against the solenoid pin at any time!  It is not 

necessary to force the handle against the pin to verify latching! Smooth and gentle 
works fine.

 

 
 

DUTY CYCLES

 

Barrett standard machine maximum duty cycles are as follows: 
 

Model  

 

Max. Load   

 

Max. No. Start-Stop Cycles/Hr

 

 401   

 

225 lbs.   

 

 

 

 

 

 

20 

1101   

 

425 lbs.   

 

 

 

 

 

 

15 

 

A note about load size

. Some sludges (for instance, cast iron) are denser than others. Metal 

type and fine size can affect the weight of a load. Do not be tempted to exceed the load sizes 
noted above. They will accommodate most sludge types. Remember: a pound of sludge will 
effectively weigh hundreds of pounds under centrifugal force. Overloading may cause 
machine failure and damage to the machine or injury to personnel. 

Do not overload!

 

 

 

THE 1101-E AND 1101-SES PANS AND COVERS ARE MATCHED SETS AND 
ARE NOT INTERCHANGEABLE!  DO NOT ATTEMPT TO RUN THE INCORRECT 
COVER WITH THE CHOSEN PAN OR MACHINE DAMAGE MAY RESULT! 

 
 

1101E EXTRACTOR PAN & COVER 

 

When operating this machine use care to load the pan evenly to insure a good running 
balance.  Make sure all guards and covers are in place.

 

 

l.Before operating the machine be sure that provisions have been made to capture extracted liquid 

from the outlet at the rear of the machine. 

 
2.Adjust the cycle timer 1TRE.  Barrett recommends an initial setting of three minutes for the 1101E 

(the SES will require a longer cycle time.   Close and latch the control panel door.  (Note: The 
required  cycle  time  will  vary  with  the  application  and  must  be  determined  through 
experimentation.) 

 
3.Turn power on at main disconnect; push the "Blower Start" button located on control panel door.  

The green "OPEN" light will light within 2-4 seconds. 

 

Содержание 401

Страница 1: ...ludge Prior to using it on any other application you should contact Barrett Centrifugals Inc to determine if the machine can be used successfully and safely THIS EQUIPMENT MUST BE INSTALLED WIRED OPER...

Страница 2: ...and possibly a variable speed drive VFD Altering or tampering with the settings that are programmed into these devices could cause the machine to malfunction It could also lead to failure of the safe...

Страница 3: ...hrough bolts On concrete floors Barrett recommends the use of epoxy set type anchors to secure the machine to the floor The machine must be absolutely solid with the floor Do not set in wet cement Do...

Страница 4: ...he right hand side of the machine the customer must provide a source of clean dry ambient air piped to enter the blower Failure to comply may allow dry chips being dumped to be sucked into the blower...

Страница 5: ...to the PLC If the sequence is verified and completed in the given amount of time a flashing green light indicates that the machine is properly latched and ready to start If the green light does not f...

Страница 6: ...the weight of a load Do not be tempted to exceed the load sizes noted above They will accommodate most sludge types Remember a pound of sludge will effectively weigh hundreds of pounds under centrifug...

Страница 7: ...nel 10 When the green OPEN signal lights the cycle is complete USE AND CARE OF FILTER ELEMENTS AND SPOKED PAN SES MODEL MACHINE Barrett SES type machines are equipped with special pans and filter elem...

Страница 8: ...perating this machine use care to load the pan evenly to insure a good running balance Make sure that all guards and covers are in place 1 Before operating the machine be sure that provisions have bee...

Страница 9: ...at it is securely attached Fold the upper half of the side filter which has been draped outside of the pan for sludge loading up and over the load resting it on top of the wet sludge The side filter m...

Страница 10: ...pan guide tool and spindle of the machine until it comes to rest on the pan support Release the hoist and remove the pan guide tool 13 Attach the spindle nut onto the spindle s threaded top LOCK THE P...

Страница 11: ...is disconnected the machine will coast to a stop which could take up to 15 minutes OUT OF BALANCE SWITCH OPTIONAL ON SOME MODELS All model 1100 and some 400 machines are equipped with an out of balan...

Страница 12: ...uld be replaced as a complete set 4 in the event of any spring failure 2 On machines equipped with a motor cooling blower the blower inlet screen must be inspected weekly If the screen is plugged with...

Страница 13: ...IS RUNNING To plumb the spindle remove tension from the four balancing springs by backing off the jam nuts Plumb the rotating element using a level on top of the flat machined surface of the carrier...

Страница 14: ...ore any maintenance is performed on the lid latch be sure power is off and locked out To remove the sheet metal guard protecting the latch assembly first remove the front cover of the push button stat...

Страница 15: ...d enclosure cover when complete BEARINGS The bearings in this machine are for centrifugal application having special internal fits and should be purchased from Barrett REPAIR PARTS Repair parts are av...

Отзывы: