background image

11

OPTIONAL COOLING COIL:

Connect 3/8" (9.5mm) ID tubing to the ports marked "IN", "OUT" and

"DRAIN".  Run tubing from the "IN" port to the coolant circulation and from the
"OUT" port to the coolant reservoir.  Condensation from the incubator chamber
will drain from the port marked "DRAIN.”  Run tubing from this port to a floor
drain or container.

OPTIONAL GASSING MANIFOLD:

For older style shakers, use the following instructions:

Connect 1/4" (6.4mm) ID tubing to the gas inlet port on the right side of 

the unit, near the rear.  Connect the other end of the tubing to the flow regulator 
on the gas tank.  Use only noncorrosive, nonflammable inert gases.  Connect 
1/4" (6.4mm) ID tubing to eight hose barbs inside the chamber along the back. 
Run the tubing into the vessels.

Gassing manifolds for new style shakers are installed as follows:

?

  Securely fasten the manifold to the cover with the furnished 8-32 x 5/8

tapping screws, #8 flat washers, #8 lock washers and #8-32 hex kep nuts.

?

  Attach flexible tubing to the barbed fitting on the manifold and, allowing

sufficient length for movement, cut and attach tubing to the gas source
regulator.

OPTIONAL LIGHT BANK:

Unpack the light bank carefully.  Note that the supports and hardware

are separate from the main unit.  Install the 4 supports at the corners of the 
light bank with the Phillips screws supplied.  The light bank will stand on the 4
supports.

Plug Model 4628-40 into a 120 VAC, 60 Hz grounded outlet and turn the

light switch to 

ON

.  Model 4628-41 plugs into a 240 VAC, 50 Hz grounded outlet.

If the fluorescent tubes do not light, remove the screen tabs to open the screen, 
then turn the tubes in their fixtures.  The tubes may have loosened during 
shipping. If the tubes still do not light, contact your Lab-Line  dealer to 
resolve the problem.

Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com

Содержание Lab-Line 4628-1

Страница 1: ...erutilized and idle equipment along with credit for buybacks and trade ins Custom engineering so your equipment works exactly as you specify Critical and expedited services Leasing Rentals Demos In st...

Страница 2: ...L FACTORY INSTALLED GM GASSING MANIFOLD FACTROY INSTALLED 4628 40 LIGHT BANK 120V 60 Hz 4628 41 LIGHT BANK 240V 50 DESIGNERS AND MANUFACTURERS A SUBSIDIARY of Barnstead Thermolyne 1999 North 15th Ave...

Страница 3: ...Introduction 2 Safe Operation 3 Description 4 Specifications 5 Features 6 Installation 7 Operation 8 Maintenance 9 Replacement Parts Warranty Artisan Technology Group Quality Instrumentation Guarante...

Страница 4: ...the Operation section of this manual Be sure to fill out the Warranty Registration Card and mail it in to Lab Line Instruments within seven 7 days after receiving the unit IF after reading this manua...

Страница 5: ...DO NOT OPERATE EQUIPMENT IN AN EXPLOSIVE ATMOSPHERE DO NOT INSERT FINGERS INTO EQUIPMENT WHEN IT IS OPERATING MAKE SURE ALL VESSELS ARE SECURELY CLAMPED BEFORE TURNING ON UNIT DO NOT OPERATE THE SHAK...

Страница 6: ...IT INOPERATIVE DO NOT RUN EQUIPMENT WITH AN UNBALANCED LOAD ALWAYS LOAD PLATFORMS FOR OPTIMUM STABILITY AND OPERATION PERFORM REGULAR MAINTENANCE SERVICE AS SPECIFIED IN THIS MANUAL AND KEEP UNIT IN G...

Страница 7: ...t overheating the controlling microprocessor will shut off the heaters in the event the temperature exceeds the setpoint by 2 C This is supplemented by an overt temperature safety system consisting of...

Страница 8: ...above the coolant temperature using the optional cooling coil with coolant 1 C TEMP CONTROL 37 C 0 1 C in flask TEMP UNIFORMITY 37 C 0 5 C in flask DIMENSIONS Overall 24 W x 28 D x 22 3 8 H 61 x 72 x...

Страница 9: ...r any reason should exceed the setpoint by 125 an OVERSPEED legend appears in this module and the shaker is stopped 3 TIMER MODULE Allows user to select between timing in MINUTES or HOURS or to operat...

Страница 10: ...K SIDE CIRCUIT BREAKERS Independent pushbutton reset circuit breakers for line power and shaker motor are next to the power connector If overloaded the button pops out To re set push the button in unt...

Страница 11: ...2 prong plugs ungrounded it is required that a qualified electrician replace the outlet with a new grounded type 240 VAC models require a 240 VAC 50 60 Hz power source Because of the variety of plug c...

Страница 12: ...the manifold to the cover with the furnished 8 32 x 5 8 tapping screws 8 flat washers 8 lock washers and 8 32 hex kep nuts Attach flexible tubing to the barbed fitting on the manifold and allowing su...

Страница 13: ...en secured in place on the platform and have been stoppered if necessary It is recommended that shaking action be started at less than the required speed in order to check that all containers are secu...

Страница 14: ...ter will react and start increasing the temperature to reach the setpoint Temperature controller is PID type NOTE MAXIMUM TEMPERATURE SETTING IS 60 C During operation both the Up and Down arrow keys c...

Страница 15: ...to the cooling coil fittings on the back of the unit Start the coolant flowing through the cooling coil flow rate should be at least 6 8 liters per minute The coolant temperature must be at least 15...

Страница 16: ...C SPRING TAKE OVER IT WILL CONTINUE TO RAISE THE COVER AND THEN HOLD IT OPEN AT AN APPROXIMATELY 80 DEGREE ANGLE AN OPENING PRESSURE OF APPROXIMATELY 4 POUNDS IS REQUIRED TO START PNEUMATIC SPRING OPE...

Страница 17: ...NAL RECORDER To make a record of the chamber temperature as shown on the LED readout plug a recording device into the inch 6 mm phone jack on the back of the unit Output voltage is 10 mV per degree C...

Страница 18: ...NE CUSTOMER RELATIONS DEPARTMENT AT 319 556 2241 OR 800 522 5463 NO MERCHANDISE HOWEVER SHOULD BE RETURNED DIRECTLY TO LAB LINE WITHOUT PRIOR APPROVAL FROM LAB LINE CAUTION DISCONNECT PLUG FROM ELECTR...

Страница 19: ...120V 016 673 00 Heat Control Printed Circuit Board 240V 017 230 00 Heater 600 Watt 240V 340 303 00 Heater 600 Watt 120V 340 304 00 Interconnect Cable 120V 240V 470 280 00 Motor 370 344 00 Motor Brush...

Страница 20: ...00 360 268 00 Fluorescent Lamp also may be bought locally 360 264 00 360 264 00 Switch 440 359 00 440 359 00 OPTIONAL LIGHT BANK 120 V 4628 40 240 V 4628 41 NEED A PART CALL THE LAB LINE PARTS HOTLINE...

Страница 21: ...ays from the Commencement Date Lab Line s warranty provided hereunder shall be null and void and without further force or effect if there is any i repair made to the product by a party other than Lab...

Страница 22: ...er Reciprocating Shakers open air and water bath Rockers and Rotators Low Cost Shakers Environ Blok Shaker Titer Plate Shaker Multi Wrist Shaker Water Baths excluding Aquabaths Ultrasonic Cleaners Sli...

Страница 23: ...22 FIRST IN INSTRUMENTS SERVICING SCIENCE INDUSTRY RESEARCH AND EDUCATION SINCE 1908 Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...

Страница 24: ...23 Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...

Страница 25: ...ked MODEL NO 4628 4628 1 4628 1CE 4628 5JPN CHECKED BY __________ DATE __________ PACKED BY __________ CHECKED ITEM PART NUMBER QUANTITY _________ Operation Manual 056 986 00 1 _________ Hex Tool 935...

Страница 26: ...uipment Have surplus equipment taking up shelf space We ll give it a new home Learn more Visit us at artisantg com for more info on price quotes drivers technical specifications manuals and documentat...

Отзывы: