used. The following clearances are neces-
sary:
Left and right side clearance:
•
All B-pure products, 4” minimum
Free space below canisters:
•
All B-pure products, 4” minimum
Free Space Above Center of Wall Bracket:
•
All B-pure products without meter, 4”
minimum
•
B-pure products with meter, 8”
minimum
The recommended dimensions for mounting
hardware to support your equipment are:
•
Body Diameter, 1/4” maximum
•
Head Diameter, 3/8” maximum
•
Length, 1” typical
Mounting and Utility
Connections
All B-pure installations require a user supplied
shutoff valve in the incoming water service
line. In some installations, it may be desirable
to provide an outlet shutoff valve. A drawoff
valve assembly is provided on the Dual
Holders as a standard and may be ordered as
an optional extra for other B-pure products.
(See exploded view drawing for part num-
bers.)
Mount the B-pure unit using the following
steps:
1.
Remove the wall bracket from the unit
9
I
NSTALLATION
Warning
Do not mount B-pure directly over
equipment that requires electrical
service. Routine maintenance of
this unit may involve water
spillage and subsequent electrical
shock hazard if improperly
located.
Caution
Wall and mounting hardware must
be capable of supporting the full
operational weights as outlined in
the technical characteristics sec-
tion of this manual. Inadequate
support or fasteners may result in
damage to mounting surface
and/or equipment. Use adequate
hardware for the job. If you are
unsure of the hardware, consult
your building maintenance group
or contractor.
Note
If you are constructing a custom
water treatment system using B-
pure components, read the Mix
and Match section of this manual
before proceeding further.