background image

6

SECTION B: GENERAL INFORMATION

B-1)  To the Purchaser:

Congratulations! You are the owner of one of the fi nest pumps 
on the market today. Barnes® Pumps are products engineered 
and manufactured of high quality components. Over one 
hundred years of pump building experience along with a 
continuing quality assurance program combine to produce a 
pump which will stand up to the toughest applications.

This Barnes Pumps manual will provide helpful information 
concerning installation, maintenance, and proper service 
guidelines.

B-2) Receiving:

Upon receiving the pump, it should be inspected for damage 
or shortages. If damage has occurred, fi le a claim immediately 
with the company that delivered the pump. If the manual is 
removed from the packaging, do not lose or misplace.

B-3) Storage:
Short Term -

 Barnes Pumps are manufactured for effi cient 

performance following long inoperative periods in storage. 
For best results, pumps can be retained in storage, as factory 
assembled, in a dry atmosphere with constant temperatures 
for up to six (6) months.

Long Term -

 Any length of time exceeding six (6) months, but 

not more than twenty four (24) months. The units should be 
stored in a temperature controlled area, a roofed over walled 
enclosure that provides protection from the elements (rain, 
snow, wind blown dust, etc..), and whose temperature can be 
maintained b40 deg. F and +120 deg. F.
If extended high humidity is expected to be a problem, all 
exposed parts should be inspected before storage and all 
surfaces that have the paint scratched, damaged, or worn 
should be recoated with a water base, air dry enamel paint. All 
surfaces should then be sprayed with a rust-inhibiting oil.

Pump should be stored in its original shipping container.

B-4) SERVICE CENTERS:

For the location of the nearest Barnes Service Center, your 
Barnes representative or Crane Pumps & Systems, Inc., 
Service Department in Piqua, Ohio, telephone (937) 778-8947 
or Crane Pumps & Systems Canada Inc., Bramton, Ontario 
(905) 457-6223.

SECTION C: PREPARE PUMP FOR OPERATION :

1.  Before making electrical power connections, check for
 

proper grounding of motor and application. All electrical

 

contacts and connections must be properly insulated and

 enclosed.
2.  Prior to connecting to the power line, check nameplate 
 

for proper voltage. The motor should be installed in

 

compliance with the National Electrical Code or the

 

Canadian Electrical Code and any other applicable codes.

 

Voltage at motor

 NOT

 to or - 10% of nameplate

 voltage.
3.  For best performance locate pump as close to water as
 

possible. Vertical suction lift should not exceed 

 

25 ft. (7.6M) At high lifts, 15 ft. (4.5M) and up, a foot valve

 

is recommended, and a size smaller suction hose, will 

 

give better operation and same capacity.

4.  Extra heavy faced nipples in suction and discharge
 

connections protect the threads in these castings. 

 

To connect a hose fi tted with a male nipple, use a 

 

coupling or union. Seal threads with grease or thread

 

sealer to prevent air leaks. To connect a hose fi tted with 

 

a female coupling, gasket must be in place and in good

 

condition. Suction hose must be in good condition with 

 

no leaks and lining tight. A loose lining will collapse under

 

suction and keep liquid from being drawn into pump. A

 

coarse strainer at end of suction hose is advisable if there

 

is a possibility of pumping large, hard, unbreakable solids,

 

such as, rocks, wood, tin cans, etc., that could be caught

 

between connecting rod and water box, causing pump

 damage.
5.  To lead water away, connect non-collapsible suction hose
 

to nipple in discharge connection. Discharge hose should

 

not be smaller than suction hose and not kinked. It is 

 

helpful to use a short piece of hose at any time, with 

 

open end raised a foot or so above discharge connection.

 

This retains water to seal the discharge valve and 

 

improves capacity and operation. Discharge head should 

 

never exceed 25 ft. (7.6M).

6.  On high lifts, or if pump has been idle and valves are dry,
 

remove cap on suction chamber and pour water into pump.

 

This will seal valves and speed up priming. Replace cover

 

securely to keep air from leaking into suction line.

7.  Drain pump in freezing weather by tipping unit toward
 

discharge side with hoses disconnected.

8.  Check oil level in the pump transmission. If it is not up to
 

the oil level plug in the cover, top off with an 

 

SAE 80 - 90 EP gear lube. Transmission oil capacity is

 

20 oz. (550 ml).

MODEL NO

SIZE

NPT

INCHES

HP

VOLT/PH

Hz

RPM

(Nom)

NEMA

START

CODE *

FULL

LOAD

AMPS *

LOCKED

ROTOR

AMPS *

2ADE11

2

1.0

115/230/1

60

1750

K

12.8/6.4

37

2ADE13

2

1.0

230/460/3

60

1750

J

3.8/1.9

22

2CDE11

2

1.0

115/230/1

60

1750

K

12.8/6.4

37

2CDE13

2

1.0

230/460/3

60

1750

J

3.8/1.9

22

3ADE151

3

1.5

115/230/1

60

1750

J

17.2/8.6

52

3ADE153

3

1.5

230/460/3

60

1750

J

4.6/2.3

29

3CDE151

3

1.5

115/230/1

60

1750

J

17.2/8.6

52

3CDE153

3

1.5

230/460/3

60

1750

J

4.6/2.3

29

(*) Electrical data subject to Motor manufacture.

Содержание 2ADE11

Страница 1: ...ogram product changes may occur As such Crane Pumps Systems reserves the right to change product without prior written noti cation 420 Third Street 83 West Drive Bramton Piqua Ohio 45356 Ontario Canad...

Страница 2: ...TS 7 EXPLODED VIEW 8 PARTS LIST SERIES 2CDE 3CDE 9 10 PARTS LIST SERIES 2ADE 3ADE 11 12 RETURNED GOODS POLICY 13 WARRANTY 14 START UP REPORT 17 18 WARRANTY REGISTRATION Other brand and product names a...

Страница 3: ...commendation for maximum performance as this could cause the motor to overheat When towing pump behind a vehicle make sure hitch is properly attached always attach safety chains WARNING If Engine driv...

Страница 4: ...namel TRANSMISSION Enclosed Oil Bath Double Reduction GEAR RATIO 43 1 OUTPUT STROKES 41 Per Minute MOTOR Design TEFC NEMA B Torque curve C Face Squirrel cage induction Insulation Class B SINGLE PHASE...

Страница 5: ...minum Class 319 CDE Cast Iron ASTM A 48 Class 30 WATER BOX ADE Aluminum Class 319 CDE Cast Iron ASTM A 48 Class 30 DIAPHRAGM BOTTOM ADE Aluminum Class 319 CDE Cast Iron ASTM A 48 Class 30 DIAPHRAGM Th...

Страница 6: ...ical Code or the Canadian Electrical Code and any other applicable codes Voltage at motor NOT to exceed or 10 of nameplate voltage 3 For best performance locate pump as close to water as possible Vert...

Страница 7: ...reases or chemicals 10 ENCLOSED GEAR CASE Change the grear case oil after the rst 40 hours of operation Check every 40 hours of operation and keep oil at level plug Change at 500 hour intervals and se...

Страница 8: ...8...

Страница 9: ...3 16 Grease Fitting 3 16 Alemite 1728B 25 1 P5582 P5581 Connecting Rod Bearing 26 2 W70 807 W70 807 Woodruff Key 1 4 x 7 8 27 1 P5584 P5583 Crank Arm 28 1 BC090 C031 031 same Set Socket Hd Screw 5 16...

Страница 10: ...3CDE151 1 Motor 1 5HP 3PH 3CDE153 70 1 P3691 P3691 Guard 72 2 DC290 X19 050FZ same Self Tap Screw 10 24 x 1 2 WHEEL MOUNTING 73 1 P3320A P3320A Towing Pole 74 1 P3327 P3327 Bumper 75 2 W27 4A W27 4A...

Страница 11: ...d Bearing 26 2 W70 807 W70 807 Woodruff Key 1 4 x 7 8 27 1 P5584 P5583 Crank Arm 28 1 BC090 C031 031 same Set Socket Hd Screw 5 16 18 x 5 16 29 1 A010 050 0150 A010 050 0150 Hex Screw 1 2 13 x 1 1 2 3...

Страница 12: ...C290 X19 050FZ same Self Tap Screw 10 24 x 1 2 WHEEL MOUNTING 73 1 P3320A P3320A Towing Pole 74 1 P3327 P3327 Bumper 75 2 W27 4A W27 4A Wheels 8 x 1 75 76 1 P3318A P3318A Axle 77 2 P3039 N A Axle Clam...

Страница 13: ...o Insure That Employees Will Not Be Exposed To Health Hazards In Handling Said Material All Applicable Laws And Regulations Shall Apply IMPORTANT WARRANTY REGISTRATION Your product is covered by the e...

Страница 14: ...guarantees in the nature of performance speci cations furnished in addition to the foregoing material and workmanship warranties on a product manufactured by us if any are subject to laboratory tests...

Страница 15: ...15 Notes...

Страница 16: ...16 Notes...

Страница 17: ...Installation Person in Charge Phone Purchased From Crane Pumps Systems Representative Distributor Pump Model Serial No Part Number Rotation Direction of impeller rotation Use C W for clockwise CC W fo...

Страница 18: ...L2 Three phase Voltage supply at panel line connection Pump Off L1 L2 L2 L3 L3 L1 Voltage supply at panel line connection Pump On L1 L2 L2 L3 L3 L1 Amperage Load connection Pump On L1 L2 L3 Final Che...

Страница 19: ...CITY STATE ZIP MODEL NO SERIAL NO PART NO BRAND IMPORTANT WARRANTY REGISTRATION Your product is covered by the enclosed Warranty Complete the Warranty Registration Form and return to Crane Pumps Syst...

Страница 20: ...CRANE PUMPS SYSTEMS INC WARRANTY SERVICE GROUP 420 THIRD STREET PIQUA OHIO 45356 U S A FOLD HERE AND TAPE DO NOT STAPLE PLACE STAMP HERE...

Отзывы: