
Manual 2100-757
Page
7 of 17
PLUG TO
SECURE INTO
FILTER TRAY
ROUTE WIRES THROUGH
WIRE MOUNT, AND INTO
HOLE AT REAR OF UNIT
INTO LOW VOLTAGE
TERMINAL BLOCK AREA
7/8" BUSHING INTO
CONTROL PANEL
MIS-2415 A
FIGURE 4
Loose Piece Wire Harness Plug Install
7. Open control panel to gain access to unit low
voltage terminal block.
8. Route electrical harness leads through the 7/8”
bushing in control panel (Figure 4) into low voltage
control box.
9. Connect leads with fork terminal to corresponding
points on terminal strip. (See wiring diagrams later
in this manual or on ventilator.) Plug connector into
corresponding hole in filter rack (see Figure 4).
10. Close control panel cover.
11. Insert ventilator into the unit (see Figure 5).
IMPORTANT:
Position front lip of ventilator on
top of front grille and condenser
partition (see Figure 5 inset). This is
important to ensure proper drainage
of any water entering damper
assembly.
12. Plug mating connector from CRV into connector in
filter rack (see Figure 5).
See page 9 to proceed to ventilator checkout procedure.
MIS-2415
Содержание WGSCRVS-3C
Страница 4: ...Manual 2100 757 Page 4 of 17 FIGURE 1 Call for Blower Operation without Ventilation...
Страница 5: ...Manual 2100 757 Page 5 of 17 FIGURE 2 Call for Ventilation...
Страница 12: ...Manual 2100 757 Page 12 of 17 Fresh Air CFM Fresh Air CFM Fresh Air CFM...
Страница 13: ...Manual 2100 757 Page 13 of 17 Fresh Air CFM Fresh Air CFM Fresh Air CFM...
Страница 14: ...Manual 2100 757 Page 14 of 17 Fresh Air CFM Fresh Air CFM Fresh Air CFM...