background image

Manual

2100-502A

Page

15 of 15

SECTION  9  •   REPLACEMENT PARTS

Replacement parts for the gas/electric units are available
through local distributors.

A replacement parts list manual is supplied with each
unit.  When ordering parts or making inquiries
pertaining to any of the units covered by these
instructions, it is very important to always supply the
complete model number and serial number of the unit.
This is necessary to assure that the correct parts (or an
approved alternate part) are issued to the service agency.

SECTION  10  •   OUTDOOR COIL

Periodic cleaning of the outdoor coil to permit full and
unrestricted airflow circulation is essential.  Reduced
airflow through the outdoor coil can shorten equipment
service life as well as increase operating costs.

SECTION  8 •  VENTILATION OPTION
ASSEMBLIES

The standard Blank Off Plate (BOP) is installed on the
inside of the vent option door to cover the air inlet
openings which eliminates outside air from entering the
unit.

The optional Commercial Room Ventilator (CRV)
allows up to 50% outside fresh air to be introduced to
the building and includes a built-in exhaust damper.
The CRV complies with ASHRAE Standard 62.1
“Ventilation for Acceptable Indoor Air Quality”.

The optional EIFM-Series Economizer allows for non-
mechanical cooling when the outdoor temperature and
humidity conditions allow.  It has automatic controls
that are set to lock out the mechanical cooling and
draw air from outside to cool the structure when the
outside air is below the control set point.  This device
can also allow some continuous fresh air to be drawn
into the structure depending on its minimum position
setting.

The optional ERV-Series Energy (Heat) Recovery
Ventilator allows for a continuous change of outside
and inside air.  It recovers up to 65% of the energy to
minimize the economic impact of conditioning the
space with fresh air when applying ASHRAE Standard
62.1 fresh air requirements.

Содержание WG3S Series

Страница 1: ... 502 File Vol I Tab 20 Date 09 05 08 Bard Manufacturing Company Inc Bryan Ohio 43506 Since 1914 Moving ahead just as planned Thank you for reading these safety statements Please read on so you will know how to maintain your air conditioner gas furnace for years of dependable service WARNING Do not use this air conditioner gas furnace if any part has been under water Immediately call a qualified se...

Страница 2: ...4 Section 7 Air Conditioning Start Up Procedure Crankcase Heater 14 Section 8 Ventilation Options 15 Section 9 Replacement Parts 15 Section 10 Outdoor Coil 15 Figures Figure 1 Typical Gas Piping 8 Figure 2 Step by Step Instructions on Lighting Burners 11 Figure 3 Filter Locations 13 Figure 4 Periodic Inspections 13 Location of Access Panels Figure 5 Start Up Procedures 14 Manufactured under the fo...

Страница 3: ...on products can contain aldehydes and carbon monoxide SECTION 1 RATING PLATE INFORMATION Record the manufacturer s name unit model number and serial number below These are your furnace rating plate Record installation date which is important for warranty purposes YOUR FURNACE INFORMATION Furnace Type ________________________________________________________________ Manufacturer s Name______________...

Страница 4: ...your unit A fire could occur resulting in damage injury or death WARNING Never store or use anything near or on your furnace that can produce vapors that are corrosive to gas fired furnaces Vapors from products containing chlorines fluorines bromines and iodines can cause vent system or heat exchanger failure Examples of such products are spray or aerosol containers detergents bleaches cat litter ...

Страница 5: ...es The inducer will continue to run for 30 seconds and the comfort air blower will continue to run for 2 1 2 minutes 3 2 BASIC OPERATION COOLING CYCLE On a call for cool the compressor and condenser fan will start immediately and the comfort air blower will start 7 seconds later on cooling speed Note Some models may be equipped with optional Low Ambient Control that will cycle the condenser fan mo...

Страница 6: ...arm Relay Output Alarm terminal on Compressor Control Module is 24V AC output connection for applications where signal is desired This terminal is powered whenever compressor is in manual lockout due to high pressure or low pressure sequences as described SECTION 4 TURNING OFF FURNACE IN AN EMERGENCY PHASE MONITOR All units with three phase scroll compressors are equipped with a three phase line m...

Страница 7: ...Meter or Propane LP Gas Tank Normally natural gas is ON when you turn shut off parallel to gas pipe Gas is OFF when you turn shut off 90 from gas pipe Some valves require a wrench or other tools 2 ELECTRICAL SHUT OFF DEVICES In an emergency you may not be able to reach both of your electrical shut off devices Therefore you must know how to turn off electricity using either one of them Here are two...

Страница 8: ...Manual 2100 502A Page 8 of 15 FIGURE 1 TYPICAL GAS PIPING ...

Страница 9: ... condition indicates lack of airflow through furnace ACTION a Make sure air filter is clean and installed correctly b Check that registers and return air grilles are open and unobstructed c If condition continues call your local qualified service technician or gas supplier 4 Possible Emergency While furnace is operating you smell unfamiliar odors that go away when furnace is off ACTION a Turn ther...

Страница 10: ...to light main burners 2 Do not touch or turn on any electrical switch 3 Do not use any phone in your building 4 Immediately call your gas supplier from a neighbor s phone Follow gas supplier s instructions 5 If you cannot reach your gas supplier call fire department 6 B LUBRICATION REQUIREMENTS The main blower motor outdoor fan motor and the induced draft blower motor are permanently lubricated an...

Страница 11: ...Manual 2100 502A Page 11 of 15 FIGURE 2 START UP PROCEDURE ...

Страница 12: ...d the structure 5 Inspect for any obvious signs of deterioration of the furnace 6 Periodic examinations of the vent terminal should also be conducted by the owner on a regular basis preferably every month but at least every two months during the heating season 7 Check the entire vent terminal for any blockage If any debris is present remove it 8 If unit is vertically vented inspect vent system ann...

Страница 13: ...Manual 2100 502A Page 13 of 15 FIGURE 3 FILTER LOCATIONS FIGURE 4 PERIODIC INSPECTIONS ...

Страница 14: ...ankcase heater It is secured on the exterior of the compressor at its base and is controlled internally within the control panel to be energized anytime the compressor is off Some form of crankcase heat is essential to prevent liquid refrigerant from migrating to the compressor causing oil pump out on compressor start up and possible valve failure due to compressing a liquid The decal in Figure 5 ...

Страница 15: ...of the vent option door to cover the air inlet openings which eliminates outside air from entering the unit The optional Commercial Room Ventilator CRV allows up to 50 outside fresh air to be introduced to the building and includes a built in exhaust damper The CRV complies with ASHRAE Standard 62 1 Ventilation for Acceptable Indoor Air Quality The optional EIFM Series Economizer allows for non me...

Отзывы: