background image

Manual   2100-359
Page  6

INSTALLATION INSTRUCTIONS

WALL MOUNTING INFORMATION

1. Two holes for the supply and return air openings must

be cut through the wall as shown in Figure 1.

2. On wood frame walls, the wall construction must be

strong and rigid enough to carry the weight of the unit
without transmitting any unit vibration.

       WARING

Fire hazard can result if 1/4 inch clearance to
combustible materials for supply air duct is not
maintained.  See Figure 2.

3. Concrete block walls must be thoroughly inspected to

insure that they are capable of carrying the weight of
the installed unit.

MOUNTING THE UNIT

1. These units are secured by wall mounting brackets

which secure the unit to the outside wall surface at
both sides.  A bottom mounting bracket is provided
for ease of installation, but is not required.

2. The unit itself is suitable for 0 inch clearance, but the

supply air duct flange and the first 3 feet of supply air
duct require a minimum of 1/4 inch clearance to
combustible material.  If a combustible wall use a
minimum of 30-1/2” x 10-1/2” dimensions for sizing.
However it is generally recommended that a 1 inch
clearance is used for ease of installation and
maintaining the required clearance to combustible
material.  The supply air opening would then be
32” x 12”.  See Figures 2 and 3 for details.

        WARNING

Failure to provide the 1/4 inch clearance
between the supply duct and a combustible
surface for the first 3 feet of duct can result in
fire causing damage, injury or death.

3. Locate and mark lag bolt locations and bottom

mounting bracket location.  See Figure 2.

4. Mount bottom mounting bracket.

5. Hook top rain flashing under back bend of top.  Top

rain flashing is shipped secured to the right side of the
back.

6. Position unit in opening and secure with 5/16 lag

bolts; use 7/8 inch diameter flat washers on the lag
bolts.

7. Secure rain flashing to wall and caulk across entire

length of top.  See Figure 2.

8. For additional mounting rigidity, the return air and

supply air frames or collars can be drilled and
screwed or welded to the structural wall itself
(depending upon wall construction).  Be sure to
observe required clearance if combustible wall.

9. On side by side installations, maintain a minimum of

20 inches clearance on right side to allow access to
control panel and heat strips, and to allow proper
airflow to the outdoor coil. Additional clearance may
be required to meet local or national codes.

Содержание WA7013

Страница 1: ...WALL MOUNTED PACKAGE AIR CONDITIONERS Model WA7013 Manual 2100 359B Supersedes 2100 359A File Volume III Tab 16 Date 05 13 02 Bard Manufacturing Company Bryan Ohio 43506 Since 1914 Moving ahead just...

Страница 2: ...ESP of Operation Electric Heat Only 15 Table 10 Pressure Table 16 Table 11 Optional Accessories 16 Getting Other Information and Publications 1 Wall Mount General Information 2 Air Conditioning Wall...

Страница 3: ...ACCA Manual D Winter and Summer Air Conditioning and Equipment Selection For more information contact these publishers ACCA Air Conditioning Contractors of America 1712 New Hampshire Ave N W Washingto...

Страница 4: ...7 1 1 8 1 0 0 8 2 1 0 9 7 1 2 0 0 6 0 3 7 8 1 0 3 0 3 2 0 0 1 6 1 4 0 3 1 4 3 2 6 3 0 0 6 5 2 MODEL NUMBER CONTROL MODULES CAPACITY 60 5 Ton VOLTS PHASE A 230 208 60 1 B 230 208 60 3 REVISIONS KW VEN...

Страница 5: ...Manual 2100 359 Page 3 FIGURE 1 UNITDIMENSIONS MIS 1456...

Страница 6: ...d o M T I U C R I C E L G N I S T I U C R I C L A U D d e t a R s t l o V e s a h P o N d l e i F r e w o P s t i u c r i C 3 m u m i n i M t i u c r i C y t i c a p m A 1 m u m i x a M l a n r e t x...

Страница 7: ...entire air conditioning system should be carefully read before beginning the installation Note particularly any tags and or labels attached to the equipment Size of unit for a proposed installation sh...

Страница 8: ...that a 1 inch clearance is used for ease of installation and maintaining the required clearance to combustible material The supply air opening would then be 32 x 12 See Figures 2 and 3 for details WAR...

Страница 9: ...Manual 2100 359 Page 7 FIGURE 2 MOUNTINGINSTRUCTIONS MIS 1445...

Страница 10: ...NING A minimum of 1 4 inch clearance must be maintained between the supply air duct and combustible materials This is required for the first 3 feet of ducting It is important to insure that the 1 4 in...

Страница 11: ...2 X 6 S AND OR STRUCTURAL STEEL THIS STRUCTURAL MEMBER LOCATED TO MATCH STUD SPACING FOR REST OF WALL A SECOND MEMBER MAY BE REQUIRED FOR SOME WALLS RETURN DUCT OPENING SUPPLY DUCT OPENING FIGURE 4 W...

Страница 12: ...Manual 2100 359 Page 10 FIGURE 6 COMMONWALLMOUNTINGINSTALLATIONS FREE AIR FLOW NO DUCT DUCTED SUPPLY RETURN AT UNIT FALSE WALL INSTALLATION CLOSETINSTALLATION MIS 550...

Страница 13: ...reventing entry Five 5 wires should be run from thermostat subbase to the 24V terminal board in the unit A five conductor 18 gauge copper color coded thermostat cable is recommended The connection poi...

Страница 14: ...Manual 2100 359 Page 12 FIGURE 7 UNIT 24V TERMINAL BOARD MIS 1373B...

Страница 15: ...nstallation connecting properly phased power leads to the same Fusite terminal should maintain proper rotation direction The direction of rotation of the compressor may be changed by reversing any two...

Страница 16: ...e due to phase reversal The phase monitor in this unit is equipped with two LEDs If the Y signal is present at the phase monitor and phases are correct the green LED will light If phases are reversed...

Страница 17: ...INDOORBLOWERPERFORMANCE CFM 230V P S E H n I 2 O 3 1 0 7 A W d e e p S h g i H l i o C y r D l i o C t e W 0 1 2 5 7 7 1 5 7 6 1 5 7 5 1 0 0 6 1 5 2 5 1 5 2 4 1 TABLE 7 REFRIGERANTCHARGE l e d o M w...

Страница 18: ...7 A W B D g e d 5 7 B W g e d 2 6 e d i S w o L e d i S h g i H 8 6 5 1 2 8 6 8 2 2 9 6 2 4 2 0 7 6 5 2 1 7 2 7 2 2 7 9 8 2 3 7 5 0 3 4 7 4 2 3 5 7 3 4 3 B D g e d 0 8 B W g e d 7 6 e d i S w o L e d...

Отзывы: