START UP

IMPORTANT INSTALLER NOTE

For improved start up performance wash the indoor coil
with a dish washing detergent.

CRANKCASE HEATERS

SH611-B and -C are provided with compressor
crankcase heat.  All other models are not provided with
crankcase heat.  They are either single phase or the
system refrigerant charge is not of sufficient quantity to
require crankcase heat.

The SH611-B and -C models have a wrap around type
heater located on the lower section of the compressor
housing.  This is an on/off heater that is controlled by
the compressor contactor.

The label in Figure 11 is affixed to all SH611-B and -C
units detailing start up procedure.  This is 

very

important.  

Please read carefully

.

HIGH PRESSURE SWITCH

All models are supplied with a remote reset high
pressure switch.  If tripped, this pressure switch may be
reset by turning the thermostat off then back on again.

THREE PHASE SCROLL COMPRESSOR

START UP INFORMATION

Scroll compressors, like several other types of
compressors, will only compress in one rotational
direction.  Direction of rotation is not an issue with
single phase compressors since they will always start
and run in the proper direction.

However, three phase compressors will rotate in either
direction depending upon phasing of the power.  Since
there is a 50-50 chance of connecting power in such a
way as to cause rotation in the reverse direction,
verification of proper rotation must be made.  All three
phase units incorporate a phase monitor to ensure proper
field wiring.  See the “Phase Monitor” section later in
this manual.

Verification of 

proper rotation

 must be made any time a

compressor is changed or rewired.  If improper rotation
is corrected at this time there will be no negative impact
on the durability of the compressor. However, reverse
operation for over one hour may have a negative impact
on the bearing due to oil pump out.

NOTE: If compressor is allowed to run in reverse

rotation for several minutes, the compressor’s
internal protector will trip.

All three phase ZR3 compressors are wired identically
internally.  As a result, once the correct phasing is
determined for a specific system or installation,
connecting properly phased power leads to the same
Fusite terminal should maintain proper rotation
direction.

Verification of proper rotation direction is made by
observing that suction pressure drops and discharge
pressure rises when the compressor is energized.
Reverse rotation also results in an elevated sound level
over that with correct rotations, as well as, substantially
reduced current draw compared to tabulate values.

The direction of rotation of the compressor may be
changed by reversing any two line connections to the
unit.

FIGURE 11

START UP LABEL

IMPORTANT

7961-411

These procedures must be followed
at initial start up and at any time power
has been removed for 12 hours or
longer.

To prevent compressor damage which
may result from the presence of liquid
refrigerant in the compressor crankcase:

1.

Make certain the room thermostat is in
the “off“ position. (The compressor is not
to operate.)

2.

Apply power by closing the system
disconnect switch. This energizes the
compressor heater which evaporates
the liquid refrigerant in the crankcase.

3.

Allow 4 hours or 60 minutes per pound
of refrigerant in the system as noted on
the unit rating plate, whichever is
greater.

4.

After proper elapsed time the thermostat
may be set to operate the compressor.

5.

Except as required for safety while
servicing, 

do not open system

disconnect switch.

Содержание SH611D

Страница 1: ...ONS WALL MOUNTED PACKAGE HEAT PUMPS Model SH611D Manual 2100 414C Supersedes 2100 414B File Volume III Tab 17 Date 05 06 05 Bard Manufacturing Company Bryan Ohio 43506 Since 1914 Moving ahead just as...

Страница 2: ...wer Performance 21 Table 10 Maximum ESP of Operation 21 Table 11 Pressure Table Cooling 22 Table 12 Pressure Table Heating 22 Getting Other Information and Publications For More Information 1 Wall Mou...

Страница 3: ...and Summer Air Conditioning Duct Design for Residential ACCA Manual D Winter and Summer Air Conditioning and Equipment Selection FOR MORE INFORMATION CONTACT THESE PUBLISHERS ACCA Air Conditioning Co...

Страница 4: ...1 B 230 208 60 3 C 460 60 3 VENTILATIONOPTIONS X Barometric Fresh Air Damper Standard 1 B Blank off Plate M Motorized Fresh Air Damper 1 V Commercial Room Ventilator Motorized with Exhaust E Economize...

Страница 5: ...h t d i W W h t p e D D t h g i e H H y l p p u S n r u t e R E F G I J K L M N O P Q A B C B D 1 1 6 H S 2 4 4 1 2 2 8 7 4 9 8 7 9 8 7 9 2 8 7 5 1 8 7 9 2 8 7 3 4 9 1 8 5 1 4 0 3 6 1 1 1 2 4 7 3 4 3...

Страница 6: ...should adhere to local codes DUCT WORK Any heat pump is more critical of proper operating charge and an adequate duct system than a straight air conditioning unit All duct work supply and return must...

Страница 7: ...grille filters must be of sufficient size to allow a maximum velocity of 400 fpm FILTERS A 1 inch throwaway filter is supplied with each unit The filter slides into position making it easy to service...

Страница 8: ...ch clearance is used for ease of installation and maintaining the required clearance to combustible material The supply air opening would then be 32 x 12 See Figures 3 and 4 for details WARNING Failur...

Страница 9: ...Manual 2100 414C Page 7 FIGURE 3 MOUNTING INSTRUCTIONS...

Страница 10: ...mum of 1 4 inch clearance must be maintained between the supply air duct and combustible materials This is required for the first 3 feet of ducting It is important to insure that the 1 4 inch minimum...

Страница 11: ...Manual 2100 414C Page 9 FIGURE 5 WALL MOUNTING INSTRUCTIONS FIGURE 6 WALL MOUNTING INSTRUCTIONS MIS 548 SEE FIGURE 4 MOUNTING INSTRUCTIONS SEE UNIT DIMENSIONS FIGURE 1 FOR ACTUAL DIMENSIONS...

Страница 12: ...Manual 2100 414C Page 10 FIGURE 7 COMMON WALL MOUNTING INSTALLATIONS MIS 550 FREE AIR FLOW NO DUCT DUCTED SUPPLY RETURN AT UNIT FALSE WALL INSTALLATION CLOSET INSTALLATION...

Страница 13: ...event unauthorized access to the disconnect To convert for the locking capability bend the tab locate in the bottom left hand corner of the disconnect opening under the disconnect access panel straigh...

Страница 14: ...e and in Table 4 will work with this equipment The thermostat and subbase must be matched and the correct operation can be assured only by proper selection and application of these parts FIGURE 8 SHXX...

Страница 15: ...MABLE THERMOSTAT FULL TIME DEHUMIDIFICATION IMPORTANT NOTE Only the thermostat and subbase combinations as shown in Table 4 will work with this equipment The thermostat and subbase must be matched and...

Страница 16: ...or of the equipment must manually place the system switch in this position This is done when there is a known problem with the unit or when the red flashing LED comes on indicating a problem FIGURE 10...

Страница 17: ...low pressure trip by the electronic heat pump control This is a 24 VAC output W2 terminal is second stage heat if equipped O1 terminal is the ventilation input This terminal energizes any factory inst...

Страница 18: ...rewired If improper rotation is corrected at this time there will be no negative impact on the durability of the compressor However reverse operation for over one hour may have a negative impact on th...

Страница 19: ...e energized by manual fan switch on subbase for constant air circulation Refer to Figure 14 HEATING SEQUENCE On a call for heating the compressor and reversing valve of the unit are energized to provi...

Страница 20: ...g for time to elapse Use a small screwdriver or other metallic object or another 1 4 inch QC to short between the SPEEDUP terminals to accelerate the HPC timer and initiate defrost Be careful not to t...

Страница 21: ...i s a h p r e w o P t c e r r o c e s a h p n o D E L d e r r o f k c e h C y l n o s t i n u e s a h p 3 r o t i n o m t i n u e h t o t s d a e l r e w o p o w t h c t i w S r o t o m r o o d t u o...

Страница 22: ...66418 64399 62449 60565 58745 56985 55284 53640 52051 50514 49028 47590 46200 44855 43554 42295 41077 25 0 26 0 27 0 28 0 29 0 30 0 31 0 32 0 33 0 34 0 35 0 36 0 37 0 38 0 39 0 40 0 41 0 42 0 43 0 44...

Страница 23: ...s n e m i D D 1 1 6 H S 5 7 1 TABLE 7 REFRIGERANTCHARGE l e d o M d e t a R w o l f r i A D O 5 9 e r u t a r e p m e T D O 2 8 e r u t a r e p m e T D 1 1 6 H S 0 5 3 1 1 5 8 4 3 5 0 5 Rated CFM and...

Страница 24: ...S h g i H 9 6 1 8 1 0 7 7 0 2 2 7 9 2 2 3 7 7 4 2 5 7 1 6 2 6 7 2 7 2 6 7 8 7 2 7 7 1 8 2 8 7 0 8 2 B D g e d 5 8 B W g e d 2 7 e d i S w o L e d i S h g i H 1 7 7 8 1 2 7 4 1 2 5 7 7 3 2 6 7 6 5 2 8...

Страница 25: ...Manual 2100 414C Page 23 FIGURE 14 BARD HEAT PUMP COOLING MODE CIRCUIT DIAGRAM FIGURE 15 BARD HEAT PUMP DEHUMIDIFICATION MODE CIRCUIT DIAGRAM...

Отзывы: