Bard ERVF-A3 Скачать руководство пользователя страница 3

Manual 2100-512B
Page 

3 of 15

Model Nomenclature Legend

General Description

The wall mount energy recovery ventilator was designed 
to provide energy efficient, cost-effective ventilation 
to meet IAQ (indoor air quality) requirements while 
still maintaining good indoor comfort and humidity 
control for a variety of applications such as schools, 
classrooms, lounges, conference rooms, beauty salons 
and others. It provides a constant supply of fresh air 
for control of airborne pollutants including CO

2

, smoke, 

radon, formaldehyde, excess moisture, virus and 
bacteria.
The ventilator incorporates patented rotary heat 
exchanger to remove both heat and moisture.
It is designed as a single package which can be 
easily factory- or field-installed for new installations 
or retrofit to the Bard W**A, W**H and C**H series 
wall-mounted units. The package consists of a unique 
rotary energy recovery cassette that can be easily 
removed for cleaning or maintenance. The ERVF-*3/
CHERV-*3 has two 13” diameter heat transfer wheels. 
The heat transfer wheels use a permanently bonded dry 
desiccant coating for total heat recovery.
Ventilation is accomplished with two blower/motor 
assemblies each consisting of a drive motor and dual 
blowers for maximum ventilation at low sound levels. 
The intake and exhaust blowers can be operated at the 
same speed (airflow rate) or different speeds to allow 
flexibility in maintaining desired building pressurization 
conditions. Factory shipped on medium intake and low 
exhaust. See Figure 6A on page 11 to change speeds. 
The rotating energy wheels provide the heat transfer 
effectively during both summer and winter conditions. 
Provides required ventilation to meet the requirements 
of ASHRAE 62.1 standard.

Electrical Specifications

NOTE:

  During operation below 5˚ F outdoor 

temperature, freezing of moisture in the heat 

transfer wheel can occur. Consult the factory if 

this possibility exists.

General Information

The ventilator should only be installed by a trained 
heating and air conditioning technician. These 
instructions serve as a guide to the technician 
installing the ventilator package. They are not 
intended as a step-by-step procedure with which the 
mechanically inclined owner can install the package.
The ventilator housing is shipped in one carton, which 
contains the following:
1.  Energy recovery ventilator
2.  Service soor
3.  Rain hood and mist eliminator
4.  Installation instructions

Unpacking

Upon receipt of the equipment, be sure to compare the 
model number found on the shipping label with the 
accessory identification information on the ordering and 
shipping document to verify that the correct accessory 
has been shipped.
Inspect the carton housing of each ventilator as it is 
received, and before signing the freight bill, verify that 
all items have been received and that there is no visible 
damage. Note any shortages or damage on all copies 
of the freight bill. The receiving party must contact 
the last carrier immediately, preferably in writing, 
requesting inspection by the carrier’s agent. Concealed 
damage not discovered until after loading must be 
reported to the carrier within 15 days of its receipt.

Model

Voltage

Amps

Control

Voltage

ERVF-A3

CHERV-A3

230/208

2.2

24V

ERVF-C3

CHERV-C3

460

1.2

24V

Energy Recovery Ventilator

Wall Mount  –  Cabinet Size
  2 =  W18-24A, L and H
  3 =  W30-36A, L and H
  5 =  W42-60A, L and H 

  

ERV 

F — A 

3

2-Piece Front Door

Electrical
  A =  230/208 volt
  B =  230/208 volt
  C =  460 volt

Содержание ERVF-A3

Страница 1: ...ENERGY RECOVERY VENTILATOR WITH EXHAUST For Use with Bard 2 1 2 through 3 Ton Wall Mount Air Conditioners and Heat Pumps INSTALLATION INSTRUCTIONS Bard Manufacturing Company Inc Bryan Ohio 43506 www...

Страница 2: ...Control Wiring 12 Control Requirements 12 Recommended Control Sequences 12 Ventilation Airflow 12 Energy Recovery Ventilator Maintenance 13 Figures Figure 1 Removing Access Panels 6 Figure 2 Removing...

Страница 3: ...mer and winter conditions Provides required ventilation to meet the requirements of ASHRAE 62 1 standard Electrical Specifications NOTE During operation below 5 F outdoor temperature freezing of moist...

Страница 4: ...6862 5400 5400 5400 12150 6525 1462 0 0 11407 7751 4460 3510 3510 3510 7897 4241 950 0 0 90 80 75 70 65 60 28080 19080 10980 6480 6480 6480 21600 12600 4500 0 0 17690 12020 6917 4082 4082 4082 13608 7...

Страница 5: ...ese 24 volt control wires control the starting and stopping of the energy recovery ventilator and can be independently controlled by an energy management control or timer See separate section on Contr...

Страница 6: ...vent option panel Refer to the Control Wiring Section for suggested control schemes After wiring replace all panels 16 Replace the vent option access panel with the new panel provided Attach air intak...

Страница 7: ...Manual 2100 512B Page 7 of 15 FIGURE 2 Removing Filter and Grille REMOVE DISCARD...

Страница 8: ...Manual 2100 512B Page 8 of 15 FIGURE 3 Running Wiring FIGURE 3 INSET SIDE VIEW SEE STEP 5 OF INSTRUCTIONS...

Страница 9: ...Page 9 of 15 MIS 2641 INSTALL 1 480701 0 CAP AS SHOWN AND WIRE PER WIRING DIAGRAM FROM HEAT RECOVERY ASSEMBLY LOW VOLTAGE WIRES TEMPORARY CONNECTION FOR TESTING SEE RECOMMENDED CONTROL SEQUENCES FIGUR...

Страница 10: ...Manual 2100 512B Page 10 of 15 FIGURE 5 Replacing Access Panel...

Страница 11: ...Manual 2100 512B Page 11 of 15 FIGURE 6 Airflow Diagram FIGURE 6A Speed Tap Label...

Страница 12: ...l possible control scenarios are listed below 1 Use a programmable electronic thermostat with auxiliary terminal to control the ERVF 3 CHERV 3 based on daily programmed occupance periods Bard markets...

Страница 13: ...grease tars and dirt that can impede performance or generate odors Washing of the desiccant surfaces is required to remove contaminate buildups that can reduce adsorption of water molecules The contin...

Страница 14: ...evaporator coil cleaner or alkaline detergent solution such as 409 NOTE Do not use acid based cleaners aromatic solvents temperatures in excess of 170 F or steam Damage to the wheel may result Do not...

Страница 15: ...Manual 2100 512B Page 15 of 15 FIGURE 8 Hub Assembly with Ball Bearings...

Отзывы: