HUMIDITY CONTROL OPTION
Note:
This function is not available if controller is
configured for heat pump.
The standard air conditioning system can be adapted
to perform dehumidification control by addition of a
simple humidity controller that closes-on-rise, and
is connected to terminals H1 and H2 on the main
controller board. Recommended Bard Part #8403-038
(H600A 1014). Both HVAC units must be equipped
with electric heat for this sequence to work properly.
See appropriate connection diagram - Figures 1 - 12 for
this connection:
1. Temperature control always has priority over
dehumidification. If there is any stage of cooling
demand active, the dehumidification sequence is
locked
out.
2. If all stages of cooling are satisfied, and relative
humidity is above the setpoint of humidity
controller:
a. The green “Dehumid. Operation” light will come
on,
and
the
lag unit compressor and blower will
operate until the setpoint of humidity controller
is satisfied (or cancelled by a call for cooling).
b. If the space temperature drops to 67F, the
electric heater of the lead unit will cycle to help
maintain building temperature. It will cycle off
at
69F.
c. If space temperature drops to 64F, the Stage 2
Heating light will come on and the lag unit
compressor operating for dehumidification mode
will cycle off until the building temperature rises
above 65F from 1st stage heat and building load.
The green “Dehumid. Operation” light stays on
during this sequence, and when Stage 2 Heating
light is Off, the compressor is On. The electric
heater in lag unit is locked out in
dehumidification mode.
Lag unit outputs G, Y1 and Y2 are all switched on
during dehumidification sequence. This is true
for both alternating and non-alternating controller
configurations.
COOLING OPERATING SEQUENCES
FOR ALTERNATING LEAD/LAG/LEAD/
LAG CONFIGURATION
1. 1-Stage Compressor Units No Economizer
1
st
stage cooling setpoint is the setting (SP) input into
the controller. Factory default is 77F (25C). On a call
for cooling the blower of the lead unit will come on
immediately (if not already on – See Blower Operation),
and the Stage 1 LED will blink for 10-seconds before
going solid, at which time the compressor will start.
2
nd
cooling setpoint is 4F (default setting, user
selectable 2-6F) warmer than Stage 1. On a call for 2
nd
Stage cooling the blower of the lag unit is turned on (if
not already on – See Blower Operation), and the Stage
2 LED will blink for 10-seconds before going solid, at
which time the compressor will start.
3
rd
and 4
th
stages are functional outputs but there is
nothing to be controlled.
2. 2-Stage Compressor Units No Economizer
1
st
stage cooling setpoint is the setting (SP) input into
the controller. Factory default is 77F (25C). On a call
for cooling the blower of the lead unit will come on
immediately (if not already on – See Blower Operation),
and the Stage 1 LED will blink for 10-seconds before
going solid, at which time the lead unit compressor will
start in compressor Stage 1 partial capacity operation.
2
nd
cooling setpoint is 4F (default setting, user
selectable 2-6F) warmer than Stage 1. On a call for
2
nd
Stage cooling the blower of the lag unit is turned
on (if not already on – See Blower Operation), and the
Stage 2 LED will blink for 10-seconds before going
solid, at which time the lag unit compressor will start in
compressor Stage 1 partial capacity operation.
3
rd
cooling setpoint is 2F (default setting, user
selectable 2-3F) warmer than Stage 2. On a call for
3
rd
Stage cooling the Stage 3 LED comes on solid (no
delay), and the lead unit compressor will switch to
compressor Stage 2 full capacity operation.
4
th
cooling setpoint is 2F (default setting, user
selectable 2-3F) warmer than Stage 3. On a call for
4th Stage cooling the Stage 4 LED comes on solid
(no delay), and the lag unit compressor will switch to
compressor Stage 2 full capacity operation.
3. 1-Stage Compressor Units with Older EIFM
Economizers (Enthalpy OD Sensor)
1
st
stage cooling setpoint is the setting (SP) input
into the controller. Factory default is 77F (25C).
On a call for cooling the blower of the lead unit
will come on immediately (if not already on – See
Blower Operation), and the Stage 1 LED will blink
for 10-seconds before going solid, at which time
the lead unit Y1 cooling output turns on. If the
Humidity controller setpoint should be in 50-60%
relative humidity area: Setting controller to lower
settings will result in excessive operating time and
operating costs for the electric reheat, and in extreme
cases could cause evaporator (indoor) coil freeze-up
if there are periods of light internal equipment (heat)
loading.
CAUTION