background image

Manual 2100-533A
Page

2 of 12

CONTENTS

Electrical Specifications .......................................... 3

General Description of ERV ................................... 3

Control Requirements ............................................ 3

Recommended Control Sequences ....................... 4

Control Wiring ........................................................ 4

Ventilation Airflow ................................................... 4

Performance & Application Data ............................ 5

Energy Recovery Ventilator Maintenance ........ 6 & 7

Maintenance Procedures ....................................... 7

Figures

Figure 1 Blower Speed Adjustment ....................... 4
Figure 2 Belt Replacement .................................... 8
Figure 3 Hub Assembly with Ball Bearings ............ 9
Figure 4 Disconnect & Tape Off Wiring ................ 11
Figure 5 Field Set CO

2

 Sensor Jumpers .............. 12

Wiring Diagram

.............................................................. 10

Tables

Table 1

Ventilation Air (CFM) ................................ 4

Table 2

Summer Cooling Performance ................ 5

Table 3

Winter Heating Performance ................... 6

COPYRIGHT DECEMBER 2009

BARD MANUFACTURING COMPANY, INC.

BRYAN, OHIO  USA  43506

Содержание 920-0074 QWSERV

Страница 1: ...20 0074 QWSERV ENERGY RECOVERY VENTILATOR WITH EXHAUST For Use With Bard 2 Through 5 Ton QW S Series Bard Manufacturing Company Inc Bryan Ohio 43506 Since 1914 Moving ahead just as planned Manual 2100 533A Supersedes 2100 533 File Volume II Tab 14 Date 12 08 10 ...

Страница 2: ...ator Maintenance 6 7 Maintenance Procedures 7 Figures Figure 1 Blower Speed Adjustment 4 Figure 2 Belt Replacement 8 Figure 3 Hub Assembly with Ball Bearings 9 Figure 4 Disconnect Tape Off Wiring 11 Figure 5 Field Set CO2 Sensor Jumpers 12 Wiring Diagram 10 Tables Table 1 Ventilation Air CFM 4 Table 2 Summer Cooling Performance 5 Table 3 Winter Heating Performance 6 COPYRIGHT DECEMBER 2009 BARD MA...

Страница 3: ...t recommended below 5 F outdoor temperature because freezing of moisture in the heat transfer wheel can occur CONTROL REQUIREMENTS 1 Indoor blower motor must be run whenever the ERV is run 2 Select the correct motor speed on the ERV Using Table 1 of the ERV Installation Instructions determine the motor speed needed to get the desired amount of ventilation air needed For instance do not use the hig...

Страница 4: ...ontrol circuit from the factory With the X Remote Thermostat Option it is default wired into the A terminal which drives the vent to operate only during occupied periods when using a Bard 8403 060 thermostat or Bard CS2000 controller If you prefer for the QWSERV to operate anytime the blower is operational you will need to install a jumper wire from G to A If you prefer to use Bard 8403 056 CO2 co...

Страница 5: ... 3 2 8 0 8 4 6 0 8 4 6 0 8 4 6 0 8 4 6 0 8 4 6 0 8 4 6 0 8 4 6 0 8 5 4 1 0 3 8 7 5 5 7 1 0 0 0 1 1 4 1 7 8 5 9 7 1 5 5 1 4 3 4 1 4 3 4 1 4 3 4 1 4 3 4 1 4 3 4 1 4 3 4 1 4 3 4 8 6 7 9 6 4 2 5 5 7 1 1 0 0 0 9 0 8 5 7 0 7 5 6 0 6 0 9 5 1 3 5 6 4 1 2 2 5 3 2 1 0 9 2 7 0 9 2 7 0 9 2 7 0 9 2 7 0 9 2 7 0 9 2 7 0 9 2 7 0 0 3 4 2 5 7 1 4 1 2 6 0 5 0 0 3 3 5 0 2 2 5 9 3 1 9 2 0 8 8 3 7 4 8 3 7 4 8 3 7 4 8 3...

Страница 6: ...ntain latent transfer efficiency Similar washing cycles may also be appropriate for industrial applications involving the ventilation of high levels of smoke or oil based aerosols such as those found in welding or machining operations for example In these applications latent efficiency losses of as much as 40 or more may develop over a period of one to three years NOTE Sensible performance only is...

Страница 7: ... 3 Inspect energy recovery ventilator for proper wheel rotation and dirt buildup This can be done in conjunction with Item 2 above Energize the energy recovery ventilator after inspecting the filter and observe for proper rotation and or dirt buildup 4 Recommended energy recovery wheel cleaning procedures follow Disconnect all power to the unit Open the front hinged service door to the unit 5 Remo...

Страница 8: ...LACEMENT INSTRUCTIONS Belt Replacement Instructions MIS 2166 Route 1 replacement belt in bottom groove of pulley Route 1 replacement belt in top groove of pulley If belts squeak or chirp lubricate lightly with LPS 1 or equivalent dry film lubricant ...

Страница 9: ...Manual 2100 533A Page 9 of 12 FIGURE 3 HUB ASSEMBLY WITH BALL BEARINGS ...

Страница 10: ...d Plug Motor Capacitor Capacitor 4 3 Note See Control Wiring Section of Installation Inst for Wiring Energy Recovery to Unit Note See Control Wiring Section of Installation Inst 1 2 Blower Motor Cassette Speed Plug Exhaust Relay Cassette Motor Plug Control 4 1 Motor Plug Transformer Power Plug Intake Motor Com 208V Cassette Exhaust Motor 3 Exhaust Blower Ground To Unit High Voltage 240 208 60 1 Bl...

Страница 11: ...Manual 2100 533A Page 11 of 12 FIGURE 4 DISCONNECT TAPE OFF WIRE DISCONNECT AND TAPE OFF FOR CO2 CONTROLLED VENTILATION MIS 2759 ...

Страница 12: ...f 12 FIGURE 5 FIELD SET CO2 SENSOR JUMPERS AN SET TO VOLTAGE SW2 SET TO ON OUT SET TO 20 100 AN OFF ON ON OFF 0 100 20 100 VOLTAGE CURRENT OUT SW2SW1 SW1 SET TO ON MIS 2756 QWSERV VENT PACKAGE CO2 CONTROLLER SETTING FOR 1000 PPM ...

Отзывы: