
5. Physical installation
Image 5-25
Green strap
Image 5-26
Purple strap
Image 5-27
Yellow strap
Image 5-28
No strap
-
Green strap: only for ULC-30A cooling the green lasers (chiller address: 1).
-
Purple strap: only for ULC-30A cooling the red, blue lasers and the DMD cooling channels (chiller address: 2).
-
Yellow strap: Reserved for future use (chiller address: 3).
-
No strap used: reserved for future use (chiller address: 0).
5.5
Mounting the
fi
xed covers
How to mount
1. Put the
fi
xed cover (D) back in place.
A
B
D
C
Image 5-29
2. Drive in the screws (C).
3. Put the
fi
xed cover (B) back in place.
4. Drive in the screws (A).
5.6
Connection of signal transmission cables
C
AUTION
:
Only use the RS485 cables provided by Barco. Do not use any other types of cables.
What has to be done?
Next to connecting the hoses, the communication port of the chillers must be connected with each other and with the connected
projector.
28
R5905866 ULC-30A 31/01/2018
Содержание ULC-30A
Страница 1: ...ULC 30A Installation and user manual R5905866 01 31 01 2018...
Страница 4: ......
Страница 6: ...Table of contents 2 R5905866 ULC 30A 31 01 2018...
Страница 14: ...2 Safety 10 R5905866 ULC 30A 31 01 2018...
Страница 36: ...6 Starting up 32 R5905866 ULC 30A 31 01 2018...
Страница 44: ...9 Basic replacements 40 R5905866 ULC 30A 31 01 2018...
Страница 50: ...11 Environmental information 46 R5905866 ULC 30A 31 01 2018...