3. Installation Guidelines
How to stack?
Handle as follow:
1. Put the second projector on the first one so that base plate of the second projector matches with the rigging socket of the first
projector. (image 3-22)
2. Turn the rigging sockets of the second projector counter clockwise until they are free to move up and down. (image 3-23)
3. Secure the projectors on each other by bringing the free part of the second projector into the socket of the first projector and turn
a quarter clockwise while pushing downwards until it clicks in.
4. For ceiling mounted configurations, pull on the hook (A) with the cable of the lowest projector. (image 3-24)
5. Guide hook and cable around the carry handle and guide it around the carry handle of the upper projector. (image 3-25)
6. Hook it in the foreseen hole B in the base plate of the upper projector. (image 3-26)
Image 3-22
Stacking two projectors
Image 3-23
Closing the rigging sockets
R5976801 SLM R9+ 20/10/2004
27
Содержание R9010310
Страница 1: ...SLM R9 Owner s manual R9010310 R5976801 01 20 10 2004...
Страница 4: ......
Страница 8: ...Table of contents 4 R5976801 SLM R9 20 10 2004...
Страница 14: ...2 Packaging and Dimensions 10 R5976801 SLM R9 20 10 2004...
Страница 20: ...3 Installation Guidelines Air OUT Image 3 6 Safety area around the projector 16 R5976801 SLM R9 20 10 2004...
Страница 33: ...3 Installation Guidelines A B Image 3 27 Opening the rigging sockets R5976801 SLM R9 20 10 2004 29...
Страница 34: ...3 Installation Guidelines 30 R5976801 SLM R9 20 10 2004...
Страница 92: ...7 Random Access Adjustment Mode 88 R5976801 SLM R9 20 10 2004...
Страница 124: ...10 Programmable Function Keys 120 R5976801 SLM R9 20 10 2004...
Страница 128: ...A Standard Source set up Files 124 R5976801 SLM R9 20 10 2004...
Страница 132: ...B Dust filter Replacement 128 R5976801 SLM R9 20 10 2004...