3. Installation Guidelines
Image 3-11
Inserting the lamp
Image 3-12
Securing the lamp
3.5.3
Reinstalling the Side Panel
What has to be done
After the new lamp unit has been installed, the side panel has to be remounted.
Necessary tools
A flatblade screwdriver of 5 mm
Reinstalling the side panel
1. Move the cover guides under the back cover and push the front of the cover against the projector frame lining up the cover lock
screw with the speed nut (A) on the frame. (image 3-13, image 3-14)
2. Turn with a screwdriver the side panel lock screw (B) a quarter turn clockwise to lock. (image 3-15)
20
R5976801 SLM R9+ 20/10/2004
Содержание R9010310
Страница 1: ...SLM R9 Owner s manual R9010310 R5976801 01 20 10 2004...
Страница 4: ......
Страница 8: ...Table of contents 4 R5976801 SLM R9 20 10 2004...
Страница 14: ...2 Packaging and Dimensions 10 R5976801 SLM R9 20 10 2004...
Страница 20: ...3 Installation Guidelines Air OUT Image 3 6 Safety area around the projector 16 R5976801 SLM R9 20 10 2004...
Страница 33: ...3 Installation Guidelines A B Image 3 27 Opening the rigging sockets R5976801 SLM R9 20 10 2004 29...
Страница 34: ...3 Installation Guidelines 30 R5976801 SLM R9 20 10 2004...
Страница 92: ...7 Random Access Adjustment Mode 88 R5976801 SLM R9 20 10 2004...
Страница 124: ...10 Programmable Function Keys 120 R5976801 SLM R9 20 10 2004...
Страница 128: ...A Standard Source set up Files 124 R5976801 SLM R9 20 10 2004...
Страница 132: ...B Dust filter Replacement 128 R5976801 SLM R9 20 10 2004...