2. Set up of OverView mD
OverView D 50" – DOC-3303-5 – installation manual – Revision 10 – September 2006
September 2006
September 2006
September 2006 ________________________________
________________________________
________________________________
_________________________________________________________
_________________________
_________________________
_________________________2-9
2.4
Grounding of the structure
Every support of OverView comes with a grounding kit which consists of a grounding wire (5m), the required
fixation material and the label:
Figure 2-13
grounding kit
The wire has to be connected on a vertical profile of the support. The following picture shows the connection
point – at this position, from the backside of the profile, a counter nut is attached.
Figure 2-14
where to fix the grounding cable
Fix the grounding wire to the support according the instruction shown below and attach the label above the
connection point:
grounding wire
fixation screw
spring washer
annular cable lug
washer
label
20m
m
Figure 2-15
connecting the grounding cable to the support
At least every second projection module has to be grounded! The connection of the
grounding wire to the power net of the building has to be done by a qualified electrician
of the customer!
Содержание OVERVIEW D 50"
Страница 1: ...Installation manual OVERVIEW D 50...