manualshive.com logo in svg
background image

Projector  costs  don’t  end  after  the

unit  is  delivered.  There  is  an

ongoing  cost  of  ownership

that  must  be  considered

before 

any 

projector 

purchase.

As  a  projector  is  only  part  of  a  total

solution,  its  impact  on  other  items

(sources:  DVD,  VCR,  PC;  switches;

videoconferencing  systems)  will  also

have  impact  on  the  Total  Cost  of

Ownership  (TCO)  of  the  complete 

system.

Network centric visualization:
faster Return-On-Investment

Time spent connecting devices

Time and money spent to display multiple sources

Time and money spent traveling to meetings

Time and money spent on onsite IT/AV support

Money spent due to wastage

Eliminate hidden costs 
of inefficient collaboration

One of the major costs is often

unseen and uncalculated

indirect  costs  caused

by  lack  of  efficiency

in  a  visualization 

system.  Many  senior

staff  members  and  highly

skilled 

experts 

lose 

precious  time  in  dealing

with  connectivity  and

support issues.

Отзывы: