13. Preventative maintenance actions
13. PREVENTATIVE MAINTENANCE ACTIONS
Maintenance program
The maintenance program is subdivided in time frames. The maintenance actions described in this chapter can be done by a trained
projectionist. Note that there are also annually and 4 yearly maintenance actions (not included in this manual) which must be done
by certi
fi
ed service personnel who are familiar with potential hazards of the product and all product safety checks. Contact your
service partner for more information about maintenance services.
Overview
•
•
R5906847 DP2K SLP SERIES 02/06/2017
117
Содержание DP2K SLP Series
Страница 1: ...DP2K SLP Series User and Installation manual R5906847 00 02 06 2017 ...
Страница 4: ......
Страница 15: ...1 Safety PR RESTRICTED AREA RESTRICTED AREA Image 1 2 R5906847 DP2K SLP SERIES 02 06 2017 11 ...
Страница 18: ...1 Safety 14 R5906847 DP2K SLP SERIES 02 06 2017 ...
Страница 44: ...5 Lenses Lens selection 40 R5906847 DP2K SLP SERIES 02 06 2017 ...
Страница 86: ...7 ICMP 82 R5906847 DP2K SLP SERIES 02 06 2017 ...
Страница 96: ...9 Starting up 92 R5906847 DP2K SLP SERIES 02 06 2017 ...
Страница 108: ...10 Scheimpflug 104 R5906847 DP2K SLP SERIES 02 06 2017 ...
Страница 116: ...11 Convergence 112 R5906847 DP2K SLP SERIES 02 06 2017 ...
Страница 124: ...13 Preventative maintenance actions 120 R5906847 DP2K SLP SERIES 02 06 2017 ...
Страница 141: ...15 Removal and installation of the projector covers C B A A 1 2 Image 15 7 R5906847 DP2K SLP SERIES 02 06 2017 137 ...
Страница 154: ...A Specifications A 5 Technical Regulations Certificates 150 R5906847 DP2K SLP SERIES 02 06 2017 ...
Страница 162: ...B Pin configurations 158 R5906847 DP2K SLP SERIES 02 06 2017 ...
Страница 172: ...C Environmental information 168 R5906847 DP2K SLP SERIES 02 06 2017 ...