13. Preventative maintenance actions
13.2 3 month maintenance actions
MAINTENANCE TYPE B (perform every three months)
The 3 month maintenance actions, listed below, may be performed by a trained projectionist who is familiar
with potential hazards associated with the product.
No.
Maintenance action
Remarks
1
Clean the back/side air inlet vents of the Lamp Power Supply (LPS).
Use a vacuum cleaner.
2
Clean the housing of your projector.
Removal overall dust accumulation
on projector covers. See cleaning
instructions in this manual.
R5977692 DP2K-S SERIES 10/12/2012
103
Содержание DP2K-S Series
Страница 1: ...DP2K S series User and Installation manual R5977692 00 10 12 2012...
Страница 38: ...6 Lenses Lens selection 34 R5977692 DP2K S SERIES 10 12 2012...
Страница 60: ...9 Starting up 56 R5977692 DP2K S SERIES 10 12 2012...
Страница 80: ...11 Convergence 76 R5977692 DP2K S SERIES 10 12 2012...
Страница 104: ...12 Lamp House Lamp replacement 100 R5977692 DP2K S SERIES 10 12 2012...
Страница 127: ...15 Removal and installation of the projector covers 2 3 A A C B Image 15 7 R5977692 DP2K S SERIES 10 12 2012 123...
Страница 136: ...15 Removal and installation of the projector covers 132 R5977692 DP2K S SERIES 10 12 2012...