13. Servicing
The software of the projector blocks any movement.
Top-up procedure
1. Remove both reservoir holder screws and take off the reservoir holder.
Image 13-27
Reservoir holder
2. Turn the bolt to release the pressure (1) . Turn until the white indication line is in the
Open
area (membrane is at the bottom of
the reservoir) or until you feel to much resistance.
Image 13-28
Release pressure
3. If you feel to much resistance, rotate the reservoir until it is in a vertical position.
Image 13-29
Reservoir up
Note:
Be careful not to kink the tubing. If necessary, remove the cable tie around the tubing and pull on the tubes while rotating
the reservoir (2 on image 13-28).
4. Turn off the main lid on top of the reservoir (A).
88
R59770208 DML-1200 06/11/2009
Содержание DML-1200
Страница 1: ...DML 1200 User guide R9050120 R59770208 04 06 11 2009...
Страница 12: ...1 Safety 8 R59770208 DML 1200 06 11 2009...
Страница 30: ...4 Connections 26 R59770208 DML 1200 06 11 2009...
Страница 32: ...5 Start up of the Adjustment mode 28 R59770208 DML 1200 06 11 2009...
Страница 37: ...6 Input menu Image 6 18 Image 6 19 Image 6 20 R59770208 DML 1200 06 11 2009 33...
Страница 38: ...6 Input menu 34 R59770208 DML 1200 06 11 2009...
Страница 52: ...8 Control menu 48 R59770208 DML 1200 06 11 2009...
Страница 62: ...9 Service menu 58 R59770208 DML 1200 06 11 2009...
Страница 66: ...10 Moving light control via DMX 62 R59770208 DML 1200 06 11 2009...
Страница 76: ...12 Maintenance 72 R59770208 DML 1200 06 11 2009...
Страница 98: ...A DMX chart 94 R59770208 DML 1200 06 11 2009...
Страница 104: ...C Troubleshooting 100 R59770208 DML 1200 06 11 2009...
Страница 106: ...D Specifications 102 R59770208 DML 1200 06 11 2009...
Страница 108: ...E Order info 104 R59770208 DML 1200 06 11 2009...
Страница 110: ...Glossary 106 R59770208 DML 1200 06 11 2009...