OPERATION OF BREAKOUT ASSEMBLY:
1-
Make sure the Breakout assembly is properly locked into the track. All four pins are
engaged.
2-
Connect all umbilical hoses between the power pack and breakout assembly.
CAUTION! EQUIPMENT HAZARD!
To start the engine either all the hoses must be
connected or all the hoses must be disconnected
.
Never make umbilical connections when the
engine is running.
3-
The front and rear clamping valve sections have friction hold capabilities. This allows for
constant pressure against the tool joints.
Adjusting the clamping pressure-
4-
Close one of the clamp sections. The set pressure will be displayed on the hydraulic
gauge.
5-
Turn the pressure adjustment knob clockwise to increase the pressure. Turn the knob
counter-clockwise to decrease the pressure.
NOTE- You may need to place the valve in the neutral position to make an adjustment.
Operation 35
Содержание TRIBOR 36
Страница 1: ...TRIBOR Operation Manual Final 7 19 19 Rev B ARB...
Страница 5: ...SAFETY 2 Safety...
Страница 6: ...Safety 3...
Страница 7: ...4 Safety...
Страница 8: ...Safety 5...
Страница 9: ...6 Safety...