30
UNIVERSAL-6 65
Installation instructions
• Assembly convection set:
° Secure the 2 collar adaptors to the appliance.
°
Now connect the fl exible hoses to the 2 collar adaptors (Ø125 mm) on the top of
the fi re and to the metal fi tting box on the air exit grids that are being used (do not
forget to fi t hose clamps).
° Ensure that the fl exible hose connections are gastight.
° The air exit grids cannot be fi tted until a few days later, once the masonry has
been pointed and allowed to dry. If one or more channels are connected leading
to other rooms, these rooms must be fi tted with closable grids. These are available
from your dealer, as well as the fl exible hoses and clamps required.
° Within a range of 30 cm either side and 50 cm above the escape opening (exit
grids), there must be no fl ammable materials (e.g. wooden ceiling, fi tted furniture).
• Clad the appliance on the top, sides and rear up to the front edge with an approx.
10 cm thick ceramic isolation wool fi reblanket. Leave a few centimetres clearance
between the front of the chimney and the appliance.
• Level off the appliance.
• Make a good seal between the smoke outlet from the appliance to the chimney.
See also 3.3.5.
Ensure that the entire fl ue is gas-tight.
• Ventilate the chimney, by placing ventilation openings at the top and bottom of the
chimney.
- Dimmer for installation in built-in box.
- Built-in box for dimmer.
Содержание UNIVERSAL-6 65
Страница 2: ......
Страница 4: ...4 UNIVERSAL 6 65 Installation instructions...
Страница 6: ...6 UNIVERSAL 6 65 Installation instructions...
Страница 58: ...58 UNIVERSAL 6 65 Installation instructions...
Страница 59: ......
Страница 60: ...04 010719 339764 Your Barbas dealer...