Baoding Longer Precision Pump WT3000-1FB Скачать руководство пользователя страница 3

Table of Contents

2
3
4
5
5

5

6
6

6
7

7
7

Instruction

Basic Operation

Running Interface

Menu Navigation Diagram

Pump Head Operation

Flow Mode Operation

Dispensing Mode Operation

External Control

Maintenance

Technical Specifications

P u m p H e a d I n s t a l l a t i o n

P u m p H e a d F l o w R a t e s

P u m p H e a d S e t t i n g

E n t e r F l o w M o d e

F l o w C o n t r o l

F l o w C a l i b r a t i o n

F l o w M o d e O p e r a t i o n P r o c e d u r e

E n t e r D i s p e n s i n g M o d e

D i s p e n s i n g V o l u m e

C o p y N o .

F l o w R a t e S e t t i n g

P a u s e T i m e

D i s p e n s i n g C a l i b r a t i o n

D i s p e n s i n g M o d e O p e r a t i o n P r o c e d u r e

E x t e r n a l E n a b l e S e t t i n g

A n a l o g S i g n a l C o n t r o l

F o o t s w i t c h C o n t r o l

C o m m u n i c a t i o n C o n t r o l M o d e

E x t e r n a l C o n t r o l O u t p u t

1

Impor tant Infor mation:

Please read operating manual carefully before operation.

War ning:

T

o prevent damage to pump, do not run the pump dry.

If the power line or the plug are worn or damaged please pull out
the plug (Hold the plug not the power line when pulling out).
Please shut down the power supply and pull out the plug when you
think the pump needs to be maintained or repaired.
Shut down the power supply of the pump when connecting to
external control equipment.
The International Protection rating of this pump is IP31. Do not let
liquid enter this pump drive.

War ranty:

The warranty period of this product is one year. If repair or
adjustment is necessary within the warranty period, the problem
will be corrected at no charge if it is not due to misuse or abuse on
your part, as determined by the manufacturer. Repair costs out
side the warranty period, or those resulting from product misuse or
abuse, may be invoiced to you.
Contact Longer Company or Longer ’s dealers before returning
pump to repair.
Adopt original carton or reliable package when returning pump to
repair.
Write a note on detailed description of failure phenomena and
contact information and put this note along with pump before
returning pump to repair.

Micro Gear Pump Drive Operating Manual

5

6

7

8

8
8
9
9

10
10

12

13

13

10

11

13

Содержание WT3000-1FB

Страница 1: ...icro Gear Pump Drive F Operating Manual Baoding Longer Precision Pump Co Ltd Building A Chuangye Center Baoding National High Tech Industrial Development Zone Baoding Hebei China 071051 TEL 86 312 311...

Страница 2: ...ower line when pulling out Please shut down the power supply and pull out the plug when you think the pump needs to be maintained or repaired Shut down the power supply of the pump when connecting to...

Страница 3: ...ower line when pulling out Please shut down the power supply and pull out the plug when you think the pump needs to be maintained or repaired Shut down the power supply of the pump when connecting to...

Страница 4: ...uns or stops or in dispensing mode the pump stops press the to enter prime state when the pump runs at full speed for empting filling and rinsing operation Press the again to return to common state In...

Страница 5: ...uns or stops or in dispensing mode the pump stops press the to enter prime state when the pump runs at full speed for empting filling and rinsing operation Press the again to return to common state In...

Страница 6: ...ng direction Indicate the direction of the pump The running direction of the pump can t be changed d Running status means the pump runs means the pump stops means the pump is in prime state e Control...

Страница 7: ...ng direction Indicate the direction of the pump The running direction of the pump can t be changed d Running status means the pump runs means the pump stops means the pump is in prime state e Control...

Страница 8: ...r press not to store the selection and return to previous menu Knob Knob Knob Knob Exit Key Flow Mode Operation Enter Flow Mode Press and turn the to highlight control mode line Press to enter next in...

Страница 9: ...r press not to store the selection and return to previous menu Knob Knob Knob Knob Exit Key Flow Mode Operation Enter Flow Mode Press and turn the to highlight control mode line Press to enter next in...

Страница 10: ...hlight copy number line Press to enter next interface Turn to select copy number press for confirmation Press not to store the selection and return to previous menu If the copy no is 0 the dispensing...

Страница 11: ...hlight copy number line Press to enter next interface Turn to select copy number press for confirmation Press not to store the selection and return to previous menu If the copy no is 0 the dispensing...

Страница 12: ...0 5 5 V 1 0 1 0 10kHz External Control Mode DB15 Plug Analog Control Communication Control R 485 S 1 Enable the external control function 2 These five Standard Analog Control Module need to be order s...

Страница 13: ...0 5 5 V 1 0 1 0 10kHz External Control Mode DB15 Plug Analog Control Communication Control R 485 S 1 Enable the external control function 2 These five Standard Analog Control Module need to be order s...

Страница 14: ...n and return to previous menu The pump identifies the Longer Footswitch automatically When the pump connects the footswitch the on operating panel is invalid no matter the external control setting is...

Страница 15: ...n and return to previous menu The pump identifies the Longer Footswitch automatically When the pump connects the footswitch the on operating panel is invalid no matter the external control setting is...

Страница 16: ...rol Output Communication Flow rates Function Dispensing Function Memory Function Calibration Cooling Mode Direction MG204 MG209 M 213 Membrane keypad and Knob Full speed for fast filling and emptying...

Страница 17: ...rol Output Communication Flow rates Function Dispensing Function Memory Function Calibration Cooling Mode Direction MG204 MG209 M 213 Membrane keypad and Knob Full speed for fast filling and emptying...

Страница 18: ...icro Gear Pump Drive F Operating Manual Baoding Longer Precision Pump Co Ltd Building A Chuangye Center Baoding National High Tech Industrial Development Zone Baoding Hebei China 071051 TEL 86 312 311...

Отзывы: