Action
Indication
Comments
4
Ensure that the programming key switch
is in the Run position and reapply power
to the EZ-SCREEN LS system.
EZA-RBK-1 LED: rapid flashing, and
then OFF
Receiver: Power-up Test Sequence,
scan code ("C" and "1" or "2"), and then
"C" "H" "1" (repeats)
All LEDs turn on momentarily during the
Power-up Display Test Sequence.
5
Place the programming key switch in
the Program position (clockwise).
EZA-RBK-1 LED: ON
Receiver: displays sequences "C" "H"
"1" (repeats) and then "P" "0" (repeats)
The timer resets to 10 minutes.
6
Clear the first sensing beam (CH1
synchronization beam) at the display
end of the sensor.
EZA-RBK-1: ON
Receiver: display sequences between
“P” and the number of blocked beams
Adjustments to position of the fixed
blanked object can be made within the
10 minute programming time limit.
7
Return the programming key switch to
the Run position (counterclockwise).
EZA-RBK-1 LED: slowly flashes for
approximately 5 seconds
Receiver: display indicates “P” “F” “C”
This saves the new fixed blanking
configuration.
8
Trip Output: the OSSDs turn ON.
EZA-RBK-1 LED: OFF
Receiver: display indicates normal
operation if fixed blanking is removed.
Otherwise, displays normal operation
with flashing alignment indicator(s)
corresponding to the location of the
blanked beams.
System is ready for the Trip Test, see
on page 49.
6.3.6 Trip Test
After optimizing the optical alignment and configuring fixed blanking (if applicable), perform the trip test to verify the
detection capability of the EZ-SCREEN LS System. This test also verifies correct sensor orientation and identifies optical
short circuits. After the installation has passed the trip test, the safety outputs may be connected and the commissioning
checkout may be performed (initial installations only).
1. Select the proper test piece (see
on page 49), supplied with the receiver.
Table 12: Appropriate Test Pieces for Trip Test
14 mm Resolution Models
23 mm Resolution Models
40 mm Resolution Models
14 mm (0.55 in) dia.
23 mm (0.91 in) dia.
40 mm (1.57 in) dia.
STP-13
STP-19
STP-20
2. Verify that the System is in Run mode, the Green Status indicator is On, all Alignment indicators are green, and the
amber Status indicator is On.
3. Pass the specified test piece through the defined area in three paths: near the emitter, near the receiver, and
midway between the emitter and receiver.
Receiver
Emitter
Test Piece
Figure 30. Trip Test
4. During each pass, while the test piece is interrupting the defined area, at least one Alignment indicator must be Red.
The Red Alignment indicator must change with the position of the test piece within the defined area.
EZ-SCREEN
®
LS Safety Light Screen
www.bannerengineering.com - Tel: +1.763.544.3164
49