Test and adjustment after repair
AC leakage test
The product must be insulation tested after having been dismantled.
Follow the test procedure when the product has been reassembled and is ready to
be returned to the customer.
IMPORTANT
Flashover must not occur during the testing procedure!
Insulation test
Short-circuit the two pins of the mains plug and connect them to one of the terminals
of the insulation tester.
Connect the other terminal to ground on the aerial socket.
NOTE!
To avoid damaging the product it is essential that both terminals of the insulation
tester have good contact.
Test procedure
Slowly increase the insulation tester voltage until a voltage of 1.5kV and a maximum
current of 10 mA is obtained.
Maintain the voltage for 1 to 2 seconds, then slowly reduce it to 0V.
5.14 Test and adjustment after repair, English
Содержание BeoVision 5-42 US
Страница 1: ...BeoVision 5 42 US Type 8489 Service Center repair guide English Spanish...
Страница 12: ...3 1 Wiring diagram Wiring diagram 3 1 3 1 Wiring diagram...
Страница 39: ...5 16...
Страница 55: ...5 32...
Страница 96: ...2x 21x 4x 1 2 3 4x Plasma Display Panel in service position 6 35...
Страница 98: ...C1 SS F SSP34 C1P24 2x 19x Remove contrast screen and plasma frame Remove contrast screen and plasma frame 6 37...
Страница 111: ...6 50...