Configuration • Update
Power Panel T30 User's manual V1.42 - Translation of the original documentation
87
5.2 Update
When updating the Power Panel with a USB flash drive, it is important to note that the drive must have a capacity
of at least 256 MB. In addition, an industrial-grade USB flash drive must be used (see
5.2.1 Updating with Automation Studio and a USB flash drive (AS 4.2.1 and later)
Upgrade PPT Image in Automation Studio
USB memory
Automation Studio
Power Panel
1
3
4
5
2
1. The PPT image for the Power Panel is updated in Automation Studio (upgrade).
2. Configuring the Power Panel according to requirements in Automation Studio.
3. Insert a USB flash drive in your computer and select the following menu item in Automation Studio:
AS version <4.3.3
°
Tools / Create remote install structure
AS V4.3.3 or later
°
Project / Project installation / Generate project installation package
The corresponding device (Power Panel) must be selected in the following selection dialog box. After con-
firming the selection, the target medium (connected USB flash drive) is selected and the process is started
using the button [
Download to application memory
].
The USB flash drive is reformatted and the following data is copied to the root directory:
°
PPTImage.img.gz
°
PPTImage.md5
°
PPTConfig.xml
°
PPTLogo.bmp.gz
°
PPTLogoA.gif