
Commissioning
46
Power Panel C50 User's manual V1.10
Grounding/Securing for 15.6" devices
5.1.6 VESA mount
The Power Panel has 4 threaded inserts (1) to accept a VESA mount:
1
Notice!
Standard: VESA 100
Maximum screw-in depth of the mounting screws: 8 mm
Select screws of appropriate length to prevent damage to the device.
5.2 Commissioning (Automation Runtime)
The Power Panel is delivered with Boot AR. This is an operating system with a limited range of functions but that
provides all functions necessary for an online connection between Automation Studio and the Power Panel.
In order to put the Power Panel into service, a full version of Automation Runtime must be transferred to the Power
Panel. The following options are available for this:
•
Transferring Automation Runtime over a network with a DHCP server
•
Transferring Automation Runtime over a network without a DHCP server
•
Содержание 4PPC50.0702-10A
Страница 2: ...1557771373112 1 10 2020 05 07...
Страница 75: ...Publishing information Power Panel C50 User s manual V1 10 75...