
Installation and Operations Manual
— LXL Gate Operator
5
B&B ARMR
A Division of B&B Roadway and Security Solutions 0054-9001UL Revision A2
Table of Contents
Introduction .............................................................................................................................. 2
Safety ......................................................................................................................................... 2
How to Contact Us ................................................................................................................... 4
System Installation Record ....................................................................................................... 4
1.
UL 325 And Gate Operators .............................................................................................. 7
1.1
What Is UL? .................................................................................................................................................... 7
1.2
Development Of UL-325 ................................................................................................................................. 7
1.3
Overview Of UL-325 And Gates ..................................................................................................................... 7
1.4
Gate Operator Classifications ........................................................................................................................ 8
2.
Effect On Installation ...................................................................................................... 10
2.1
Factors Related To Gate Construction And Installation ............................................................................... 10
2.2
Device-Specific Installation Instructions ...................................................................................................... 10
2.3
Statements In Manufacturer’s Instructions Concerning Installation ............................................................ 11
2.4
Gate And Fence Dealer Documentation Suggestions ................................................................................... 11
3.
LXL Operator Models And Features ............................................................................... 12
3.1
General Description ...................................................................................................................................... 12
3.2
LXL Operator Features ................................................................................................................................. 12
3.3
Models Available ........................................................................................................................................... 13
4.
Installing and Programming the LXL Operator ............................................................. 14
4.1
Prepare Concrete Pad ................................................................................................................................... 14
4.2
Anchor Gate Operator To Pad ...................................................................................................................... 14
4.3
Mount Drive Rail........................................................................................................................................... 15
4.4
Install Limit Switch Trip Plates ..................................................................................................................... 16
4.5
Connect Primary Power ................................................................................................................................ 17
4.6
Install Limit Switches .................................................................................................................................... 17
4.7
Connect Primary / Battery Power D/C Units Only ....................................................................................... 18
4.8
Connect Converter To Operator ................................................................................................................... 18
4.9
Install Vent Cap............................................................................................................................................. 18
4.10
Set Operator Handing (Inside Looking Out) ............................................................................................ 19
4.10.1
HCMSGOFF Parameter .................................................................................................................. 19
4.11
Setting The Date And Time (optional, not required) ................................................................................ 20
4.12
Setting The Max Run Timer ...................................................................................................................... 20