manualshive.com logo in svg
background image

Installation and Operations Manual 

— LXL Gate Operator 

 

 

B&B ARMR

                                                                                                                  

A Division of B&B Roadway and Security Solutions                                                                                                   0054-9001UL Revision A2

 

  

LXL Series

 

Hydraulic Slide Gate 

Operators

 

 

INSTALLATION MANUAL 

 

 

 

Model No.:_______________________ 

 Serial No.: _______________________ 

 

B&B ARMR 

Corporate Office & Tech Support: 

5900 S. Lake Forest Drive, Suite 230 
McKinney, TX 75070 
Phone: (800) 367-0387 
Fax: (972) 385-9887 

E-mail: 

[email protected]

 

[email protected]

 

www.bb-armr.com

 

MADE IN THE USA

 

 

 

Содержание LXL-15vp-SS

Страница 1: ...LXL Series Hydraulic Slide Gate Operators INSTALLATION MANUAL Model No _______________________ Serial No _______________________ B B ARMR Corporate Office Tech Support 5900 S Lake Forest Drive Suite 2...

Страница 2: ...contact us Safety SYMBOL MEANING The lightning flash with arrowhead symbol within an equilateral triangle is intended to alert the user to the presence of non insulated dangerous voltage within the pr...

Страница 3: ...t in motion 6 Test gate operator and all related safety devices monthly The gate must reverse or stop when a safety device is tripped The gate must stop upon sensing a second sequential safety violati...

Страница 4: ...Lake Forest Drive Suite 230 McKinney TX 75070 USA Telephone 972 385 7899 Toll Free 800 367 0387 Fax 972 385 9887 E mail info bb armr com techsupport bb armr com System Installation Record To assist i...

Страница 5: ...cturer s Instructions Concerning Installation 11 2 4 Gate And Fence Dealer Documentation Suggestions 11 3 LXL Operator Models And Features 12 3 1 General Description 12 3 2 LXL Operator Features 12 3...

Страница 6: ...lf Latching Lock Parameter 22 4 16 2 Maglock Parameter 23 4 16 3 Maglock Delay Parameter 23 4 17 Maintain Input Parameters 23 4 17 1 MAINOPEN Parameter 24 6 The LXL Interface Board 25 7 Secondary Safe...

Страница 7: ...operator provisions in UL 325 Some government agencies and other interested groups have monitored the standard s progress and have provided input on the final format of the provisions of the standard...

Страница 8: ...ct sensor photoelectric sensor or the equivalent See 31 1 6 31 1 9 Type B2 Provision for connection of or supplied with a contact sensor edge device or equivalent See 31 1 7 and 31 1 10 31 1 12 Type C...

Страница 9: ...nstallation and Operations Manual LXL Gate Operator 9 B B ARMR A Division of B B Roadway and Security Solutions 0054 9001UL Revision A2 Figure 1 Non Contact Sensor Detail Figure 2 Contact Sensor Detai...

Страница 10: ...y with easy rolling movement in both directions with all exposed pinch points eliminated or guarded prior to the installation of the operator Controls should be as far away from the gate as possible t...

Страница 11: ...ents 1 The operator must be appropriate for the construction of the gate and the usage class of the gate The appropriate primary and secondary safety devices to be used are a major consideration to su...

Страница 12: ...inimize uneven rotation between the wheels Rotation direction is determined by the hydraulic valve system not by the rotational direction of the electric motor Independence from the electric motor rot...

Страница 13: ...eavy Duty 1 0 ft s 3 000 lbs 600 lbs I IV LXLR 15vp SS Rack Pinion 1 0 ft s 3 000 lbs 350 lbs I IV LXLR 20vp HD Rack Pinion 1 0 ft s 4 700 lbs 450 lbs I IV LXLB 13vp SS Battery Back up 1 0 ft s 2 000...

Страница 14: ...requires connection of high voltage power which should only be performed by a licensed electrician 4 1 Prepare Concrete Pad 1 Pour concrete pad 24 W x 36 L and at least 6 below frost line 2 Conduit ne...

Страница 15: ...e the drive rail between the wheels to the closed position 3 Align the drive rail with a clearance of 12 375 inches from the base of the operator to the center of the drive rail Attach drive rail to t...

Страница 16: ...tes 1 Slide the gate to the full open position 2 On the top of the drive rail place a trip plate so that the last 2 is in front of the proximity switch 3 Mark and drill holes Mount limit switch as sho...

Страница 17: ...st 36 into the ground 4 Using a 10 solid copper wire connect ground wire from the rod to the ground lug located in the main power disconnect box 4 6 Install Limit Switches 1 Insert the limit wired int...

Страница 18: ...per wire connect ground wire from the rod to the ground lug located in the control cubicle 4 8 Connect Converter To Operator 1 Connect the converter enclosure to switch S4 in the gate operator using 6...

Страница 19: ...d 3 button station turn operator power on 3 Wait for the alarm to sound date and time will flash on first power up then release the STOP and CLOSE buttons Handing is now set 4 10 1 HCMSGOFF Parameter...

Страница 20: ...o be changed 4 Use the UP and DOWN arrow keys to change the value Use the LEFT and RIGHT arrow keys to move between lines 5 Press OK when finished NOTE Time format is military time only 4 11 Setting T...

Страница 21: ...utton 5 Trigger the open limit switch If the timer is on you will see the screen to the left 6 Repeat step 1 to toggle the timer off NOTE The AutoClose screen will not be visible if the timer is turne...

Страница 22: ...gate operator and press the ESC button to enter the main menu 5 Select Set Param and use the UP arrow key to scroll to SAFE PSI 6 Press OK to activate the cursor Enter the On value SYSTEM PRESS 30 th...

Страница 23: ...is 1 second To change this setting 1 From the main menu select Set Param 1 Press the UP grey arrow key and scroll through the options to MAGDELAY 2 Press OK 3 The 0 on the T line will start flashing...

Страница 24: ...es the Maintain Open command 1 From the main menu select Set Param 8 Press the UP grey arrow key and scroll through the options to MANCLOSE 9 Press OK 10 The S on Switch will start flashing 11 Use the...

Страница 25: ...54 9001UL Revision A2 6 The LXL Interface Board 1 24VAC 24VDC auxiliary power 2 Processor Controller 3 Built in 3 button station 4 Position indication and power loss relays 5 Secondary safety device c...

Страница 26: ...must connect the safety device to the loopsafe terminal on connector 3 Note The ROAD and BACK connections are normally open connections UL Approved Secondary Safety Devices Miller Edge manufacturer of...

Страница 27: ...UL Revision A2 8 Master Slave Connections 10 conductors required for master slave connection between operators 16 18 gauge wire plus 4 for safety devices Each operator must be programmed separately Se...

Страница 28: ...Installation and Operations Manual LXL Gate Operator 28 B B ARMR A Division of B B Roadway and Security Solutions 0054 9001UL Revision A2 9 Other Device Connections...

Страница 29: ...hown For high speed and rack and pinion users please note that these item numbers are different Number 31 will be XHYD 103 1572 for standard and high speed units Number 31 will be 0050 RS 1001010 for...

Страница 30: ...Installation and Operations Manual LXL Gate Operator 30 B B ARMR A Division of B B Roadway and Security Solutions 0054 9001UL Revision A2 2 1 General Parts Breakdown Typical Installation...

Страница 31: ...Installation and Operations Manual LXL Gate Operator 31 B B ARMR A Division of B B Roadway and Security Solutions 0054 9001UL Revision A2...

Страница 32: ...Installation and Operations Manual LXL Gate Operator 32 B B ARMR A Division of B B Roadway and Security Solutions 0054 9001UL Revision A2 2 2 Battery Backup Schematic...

Страница 33: ...Installation and Operations Manual LXL Gate Operator 33 B B ARMR A Division of B B Roadway and Security Solutions 0054 9001UL Revision A2 Battery backup Parts List DESCRIPTION B B ARMR ITEM QTY...

Страница 34: ...Installation and Operations Manual LXL Gate Operator 34 B B ARMR A Division of B B Roadway and Security Solutions 0054 9001UL Revision A2...

Страница 35: ...Installation and Operations Manual LXL Gate Operator 35 B B ARMR A Division of B B Roadway and Security Solutions 0054 9001UL Revision A2...

Страница 36: ...Installation and Operations Manual LXL Gate Operator 36 B B ARMR A Division of B B Roadway and Security Solutions 0054 9001UL Revision A2...

Страница 37: ...Installation and Operations Manual LXL Gate Operator 37 B B ARMR A Division of B B Roadway and Security Solutions 0054 9001UL Revision A2...

Страница 38: ...Installation and Operations Manual LXL Gate Operator 38 B B ARMR A Division of B B Roadway and Security Solutions 0054 9001UL Revision A2 LOGO 12 24 RC SIEMENS OK ESC DM8 12 24R RUN STOP...

Страница 39: ...Gate Operator 39 B B ARMR A Division of B B Roadway and Security Solutions 0054 9001UL Revision A2 6ED1 055 1MB00 0BA1 RUN STOP DM8 12 24R ESC OK SIEMENS 12 24 RC LOGO LOGO 12 24 RC SIEMENS OK ESC DM...

Страница 40: ...d correcting any problems with your LXL Series gate operator If you encounter problems that you cannot fix contact B B ARMR and we will gladly work with you to correct them 2 3 Alarm Definitions Conti...

Страница 41: ...fficient time is set for the gate size 5 REMEMBER Gate only may only move 1 ft sec Date and time flash on the PLC 1 Refer to step 4 11 of Installing and Programming the LXL Operator for setting the da...

Страница 42: ...or a CLOSE 3 Disengage drive wheels and check to see if they move 4 If drive wheels move check for binding in the gate 5 If drive wheels do not move check for loose coupling between the electric motor...

Страница 43: ...Location ________________________ Date Performed By Checklist Complete Anomalies Notes Jan Yes No Feb Yes No Mar Yes No Apr Yes No May Yes No Jun Yes No Jul Yes No Aug Yes No Sep Yes No Oct Yes No No...

Страница 44: ...cturer s suggested routine maintenance modifications misuse accident catastrophe neglect natural disaster act of God or if at any time the power supplied to any part of the Security Barrier falls shor...