manualshive.com logo in svg
background image

Installation and Operations Manual 

— Model B3X Series 

 

 

B&B ARMR

                                                                                                                  

A Division of B&B Roadway and Security Solutions                                                                                           0B30-9001 Revision E2

 

 

 

 

3 MAINTENANCE 

 

Do not attempt repairs unless you are trained and qualified. 
This vehicle barrier can cause equipment damage and severe 
injury if it is operated or maintained improperly.  

3.1  Introduction 

The B3X Bollards are designed to be largely maintenance free. As with any complex 
electromechanical device, they must be regularly inspected to ensure they are operating 
correctly.  A monthly visual inspection and a more thorough biannual inspection as 
described below are recommended.  Please contact B&B ARMR Technical Service 
Support for assistance with inspections, maintenance, or repairs if needed. 
Component damage is likely if a vehicle strikes the barrier.  If this occurs, contact B&B 
ARMR. We can help you assess the damage to make sure there is no hidden damage that 
will compromise safety or effectiveness and help you determine which components 
should be replaced.   

3.2  Spare Parts 

There are few failure and wear items in the B3X design.  The following table shows 
several suggested spare parts based on wear and environmental (lightening) failure 
modes. 
 

Time

(Sec)

Actual 

Required 

Flow per 

Bollard

(in^3/sec)

Actual 

Required 

Flow per 

Bollard

(gal/min)

1

53

13.8

2

27

6.9

3

18

4.6

4

13

3.4

5

11

2.8

6

9

2.3

7

8

2.0

8

7

1.7

9

6

1.5

10

5

1.4

11

5

1.3

12

4

1.1

Содержание B3 Series

Страница 1: ...D OPERATIONS MANUAL B B ARMR Corporate Office Tech Support 5900 S Lake Forest Drive Suite 230 McKinney TX 75070 Phone 972 385 7899 Toll Free 800 367 0387 Fax 972 385 9887 E mail info bb armr com techs...

Страница 2: ...he world to control access and to protect people equipment and facilities We offer a broad range of vehicle barrier and related security services Turnkey installations Routine barrier preventative mai...

Страница 3: ...f the Occupational Safety and Health Administration OSHA as well as other applicable federal state and local safety regulations and industry standards and procedures For installation outside the Unite...

Страница 4: ...11 Item 22 Proximity Switch 7 1 1 12 Options 7 2 OPERATION 8 2 1 Introduction 8 2 2 Control 8 2 3 Operating Time 8 3 MAINTENANCE 9 3 1 Introduction 9 3 2 Spare Parts 9 3 3 Monthly Inspections 10 3 4 S...

Страница 5: ...ty of drive solutions Automatic HPU Driven Semi automatic Manual and fixed are the standard drive options available The bollard system has been tested to Department of State specifications STD 02 01 T...

Страница 6: ...the cylinder This 10 inch schedule 80 steel cylinder raises and lowers to provide the obstruction during impact When raised the tube protrudes 30 36 inches of grade depending on the model 1 1 3 Tube...

Страница 7: ...8 Guide Strip The acetyl Delrin guide strips ensure the bollard cylinder can move freely with minimum maintenance required 1 1 9 Up Line Hose This hydraulic hose allows hydraulic fluid to be pressuriz...

Страница 8: ...sure The speed of operation is determined by the amount of pressurized hydraulic fluid able to pass to the bollards in a given amount of time This can be controlled by the flow control valves which ar...

Страница 9: ...ed below are recommended Please contact B B ARMR Technical Service Support for assistance with inspections maintenance or repairs if needed Component damage is likely if a vehicle strikes the barrier...

Страница 10: ...f the finish If rust is present wire brush and sand the area then paint with a primer and a matching color Vacuum and clean the pumping unit area Check oil for level pressure and condition in the HPU...

Страница 11: ...er to verify operation and control Check the PLC for normal operation of all logic and functions 3 5 Annual Maintenance Inspections We recommend you perform the following inspections annually Perform...

Страница 12: ...ntrol valve to see if problem is mechanical or electrical Q If mechanical 5 Check for binding between moving plate and frame Check connection of linkage between frame and plate Check for foreign debri...

Страница 13: ...vely hot 1 Check that the pressure relief valve is closed fully clockwise 2 Check that the pressure switch is adjusted to shut the motor off before 1900 PSI 3 Check for correct voltages Bollard moves...

Страница 14: ...ot limited to unauthorized repairs improper installation installation not performed by BBRSS authorized personnel incoming supply power is outside the tolerance for the product failure to perform manu...

Отзывы: