background image

Installation and Operations Manual 

— Model 730 Series 

MAINTENANCE

 

 

B&B ARMR

                                                                                                                  

A Division of B&B Roadway and Security Solutions        

                                                                                            

0730-9001 Revision C2 

 

 

 

 

Lubricate all pivot points and the clevis pin. 

 

 

Inspect hinge pins. 

 

 

Inspect the cylinder. 

 

 

Check hoses for wear or abrasions. 

 

 

Check the operation of the control panel(s). 

 

 

Check the control panel’s buttons and lights for proper operation and replace 
if necessary. 

 

 

Update the operation and maintenance log. 

3.3  Six-Month Inspections 

We recommend you perform the following inspections every six months. 

 

 

Repeat the visual inspections in the monthly inspection list. 

 

 

Turn the master power switch on the control circuit box to the OFF position. 

 

 

Inspect the hydraulic system for signs of oil leaks.  

 

 

CAUTION:  The hydraulic system when in operation is under 
extreme pressure.  Verify pressure on the barrier is completely 
relieved prior to removal of any hydraulic fittings. 

 

 

 

Check all fittings for tightness.  

 

 

Inspect the oil level in the HPU by opening the tank.  

 

 

Add oil as necessary. We recommend using environmentally safe oil such as 
Mobil EAL 224.  

 

 

Measure the resistance in any traffic loops and log the measurements and 
report anomalies (if applicable).

 

 

 

Open the hydraulic oil tank in the HPU and inspect the oil for dirt or water.  

 

 

When the inspection is complete, turn the power on and test cycle the barrier 
to verify operation and control. 

 

3.4  Annual Maintenance Inspections 

We recommend you perform the following inspections annually. 

 

 

Perform all quarterly maintenance steps. 

 

 

Replace the hydraulic fluid. 

 
 

 
 
 
 
 
 
 

 

Содержание 730 Series

Страница 1: ...ity Solutions 0730 9001 Revision C2 MODEL 730 SERIES BEAM BARRIER OPERATIONS MAINTENANCE MANUAL B B ARMR Corporate Office Technical Support 5900 S Lake Forest Drive Suite 230 McKinney TX 75070 Phone 8...

Страница 2: ...hout the world to control access and to protect people equipment and facilities We offer a broad range of vehicle barrier and related security services Turnkey installations Routine barrier preventati...

Страница 3: ...andards of the Occupational Safety and Health Administration OSHA as well as other applicable federal state and local safety regulations and industry standards and procedures For installation outside...

Страница 4: ...ty ii How to Contact Us iii 1 ORIENTATION 5 1 1 Overview 5 2 OPERATION 6 2 1 Introduction 6 2 2 First Time Operation 6 2 3 Control 7 2 4 Operating Time 7 3 MAINTENANCE 8 3 1 Introduction 8 3 2 Monthly...

Страница 5: ...el 730 vehicle barrier 1 1 1 Gate Arm The steel gate arm is engineered to distribute the crash impact load over the drive and receiver stanchion Coupled with the specified concrete bases the stanchion...

Страница 6: ...gate is fully open and it closes before the gate starts to close Red amber traffic lights The light remains red if the gate is in any position except fully open Infrared safety beams to detect pedestr...

Страница 7: ...eceiver post and does not oscillate contact hard or make excessive noise 2 3 Control The 730 barrier is controlled by the flow of hydraulic fluid under pressure from the HPU to the cylinder All contro...

Страница 8: ...We recommend you perform the following visual inspections monthly on the barrier system An equipment maintenance log is supplied in the appendix to assist in the logging Inspect the condition of the f...

Страница 9: ...FF position Inspect the hydraulic system for signs of oil leaks CAUTION The hydraulic system when in operation is under extreme pressure Verify pressure on the barrier is completely relieved prior to...

Страница 10: ...s mechanical or electrical 6 Check PLC input on pumping unit 7 Check that safeties are clear 8 Check PLC output on pumping unit 9 Check push button operation Barrier does not close when commanded on c...

Страница 11: ...a for debris and proper lubrication dry graphite spray 3 Check hydraulic cylinder clevis pins for lubrication multi grade grease 4 Check bearing grease Hydraulic unit excessively hot 1 Check that the...

Страница 12: ...ot limited to unauthorized repairs improper installation installation not performed by BBRSS authorized personnel incoming supply power is outside the tolerance for the product failure to perform manu...

Страница 13: ...Location ____________________________ techsupport bb armr com Date Performed By Checklist Complete Anomalies Notes Jan Yes No Feb Yes No Mar Yes No Apr Yes No May Yes No Jun Yes No Jul Yes No Aug Yes...

Отзывы: