© 2012
Ro
b
erts-Gordon LLC
All rights reser
v
ed.
N
o part of this work co
v
ered
b
y the copyrights herein may
b
e reproduced
or copied in any form or
b
y any means - graphic, electronic, or mechanical, including
photocopying, recording, taping or information storage and retrie
v
al systems - without the
written permission of Ro
b
erts-Gordon LLC.
Printed in U.S.A.
TABLE OF CONTENTS
SECTION 1: Heater Safety...................................................... 1
1.1 Manpo
w
er Req
u
irements ............................................. 1
1.2 Safety Labels and Their Placement ............................. 1
1.3 California Proposition 65 .............................................. 1
SECTION 2: Installer Responsibility ..................................... 4
2.1 Wall Tag ....................................................................... 4
2.2 Corrosive Chemicals.................................................... 4
2.3 National Standards and Applicable Codes .................. 4
SECTION 3: Critical Considerations ..................................... 5
3.1 Basic Information ......................................................... 5
3.2 Man
u
fact
u
red Units...................................................... 5
3.3 Location and S
u
spension ............................................ 5
3.4 Minim
u
m Req
u
ired Installation Clearances ................. 5
3.5
V
entilation .................................................................... 5
3.6 Gas S
u
pply .................................................................. 5
3.7 Electrical S
u
pply .......................................................... 5
3.8
V
ent.............................................................................. 5
SECTION 4: Clearances to Combustibles............................. 6
4.1 Req
u
ired Clearances to Comb
u
stibles......................... 6
4.2 Clearances to Comb
u
stibles ........................................ 6
SECTION 5: National Standards and Applicable Codes ..... 7
5.1 Gas Codes................................................................... 7
5.2 Aircraft Hangars ........................................................... 7
5.3 Parking Str
u
ct
u
res and Repair Garages ...................... 7
5.4 Electrical ...................................................................... 7
5.5
V
enting......................................................................... 7
5.6 High Altit
u
de ................................................................ 8
SECTION 6: Duct Heater Installation..................................... 9
6.1 General ........................................................................ 9
6.2 Shelf Mo
u
nting and S
u
spension ................................ 10
6.3 Wall Mo
u
nting ............................................................ 10
SECTION 7: Ventin
g
.............................................................. 12
7.1 Changing
V
ent and Air Intake Orientation .................. 12
7.2
V
enting ....................................................................... 12
7.3
V
ent Installation .......................................................... 12
7.4 Unvented Operation ................................................... 13
7.5 Horizontal
V
enting ...................................................... 13
7.6
V
ertical
V
enting........................................................... 13
7.7 Length Req
u
irements ................................................. 13
7.8
V
ent Material............................................................... 14
7.9 Replacing an Existing Heater in a
V
enting System..... 14
SECTION
8
: Air Supply ......................................................... 19
8.1 Separated Comb
u
stion Installation ............................ 19
8.2 Unvented Installation ................................................. 19
8.3 B
u
ilding
V
entilation .................................................... 19
8.4 O
u
tside Comb
u
stion Air S
u
pply ................................. 19
SECTION 9: Gas Pipin
g
........................................................ 20
9.1 Connections............................................................... 20
SECTION 10: Wirin
g
.............................................................. 22
10.1 Positioning Thermostats .......................................... 22
10.2 Lo
w
V
oltage Thermostat
w
ith One Heater................22
10.3 UHD[X][S] Series Internal Wiring Diagram ...............23
10.4 UHD[X][S] Series Ladder Wiring Diagram................24
10.5 Electrical Connection to the Heater ..........................25
SECTION 11: Operation and Maintenance ..........................26
11.1 Pre-Start-Up Checks .................................................26
11.2 Begin Start-Up ..........................................................26
11.3 Complete Start-Up ....................................................28
SECTION 12: User Instructions............................................29
12.1 Heater Operation......................................................29
12.2 Common User Controls............................................29
12.3 Lighting Instr
u
ctions .................................................30
12.4 Simple Tro
u
bleshooting ............................................30
SECTION 13: Servicin
g
.........................................................31
13.1 Servicing Instr
u
ctions...............................................31
13.2 B
u
rner Maintenance.................................................31
13.3 Heat Exchanger Maintenance ..................................31
13.4 Gas
V
alve Maintenance ...........................................31
13.5 Fl
u
e Blo
w
er ..............................................................31
13.6
V
enting and Air Intake Pipe ......................................31
13.7 Maintenance Checklist .............................................32
SECTION 14: Troubleshootin
g
.............................................34
14.1 General ....................................................................35
14.2 Tro
u
bleshooting For A
u
tomatic Ignition B
u
rner
Systems ...................................................................36
14.3 Tro
u
bleshooting for Flame S
u
pervision System .......37
14.4 Tro
u
bleshooting for Gas
V
alves ................................38
14.5 Tro
u
bleshooting for Fl
u
e Blo
w
er ...............................38
SECTION 15: Replacement Parts .........................................39
15.1 Gas
V
alve .................................................................39
15.2 B
u
rner Compartment ...............................................40
15.3 Ignition Electrode and Flame Probe .........................41
15.4 Heat Exchanger .......................................................41
15.5 Fl
u
e Blo
w
er
V
ertical Installation ...............................42
15.6 Press
u
re S
w
itch........................................................43
15.7 Ignition Control .........................................................43
15.8 Limit S
w
itches ..........................................................43
SECTION 16: Specifications.................................................44
16.1 Dimension Data........................................................44
16.2 General Technical Data Table ..................................45
16.3 Technical Data Table ................................................45
SECTION 17: BANANZA
®
UHD-Series Warranty.................47
Содержание UHD 125
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 29: ...SECTION 9 GAS PIPING 21 of 47 Figure 14 Gas Connection...
Страница 43: ...SECTION 14 TROUBLESHOOTING 35 of 47 14 1 General...
Страница 54: ...UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL 46 of 47...
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ......