Page 19
Step 6: Use a flexible hose to connect the negative port on the vacuum deadweight tester to the manual pressure
pump. Push the pressure / vacuum switch inside on the manual pressure pump. Put the bell jar on the base.
Step 7: Install the unit under test (UUT) on the one of three quick connectors, close the vent valve, open the shut
off valve, closes the isolation valve for electric vacuum pump. Put the first calculated mass on the mass carrier.
Содержание BL506
Страница 1: ...User Manual Model BL506 Vacuum Deadweight Tester ...
Страница 9: ...Page 6 2 4 SCOPE OF DELIVERY ...
Страница 10: ...Page 7 2 5 INSTRUMENT OUTLINE FOR VACUUM DEADWEIGHT TESTER BASE ...
Страница 11: ...Page 8 2 6 INSTRUMENT OUTLINE FOR MANUAL PUMP ...