STARTING UP AND REGULATION
Before starting up, make sure that:
•
Check that the nozzles fitted on the burner are suitable for the boiler
capacity. If necessary, replace them with suitable ones.
•
Make sure that the mains voltage corresponds to the manufacturer's
requirements and that all electrical connections made at the
installation site are effected properly as illustrated in our wiring
diagram.
•
Make sure that the combustion products may be freely vented
through the boiler and flue dampers.
•
Check that there is water in the boiler and that the gate valves of the
system are open.
•
Make sure that there is fuel in the tank.
•
Check that all the gate valves fitted on the fuel suction and return
pipes are open; the same applies to any other fuel shut-off devices.
•
Avoid second stage operation. Set the switch on the electrical panel
to the first stage position. If the burner does not have the first and
second stage switch, disconnect the thermostat to avoid activating
the second stage, if installed.
•
Slightly open the air regulator and let in an amount of air deemed
necessary for burner operation with the 1st stage and lock it in this
position.
•
Set the air adjustment device on the combustion head in an
intermediate position.(refer to the chapter Air regulation on the
combustion head).
•
Turn on the main switch and the one on the control panel, (S1), if
provided.
•
The programmer starts executing the preset program, activating the
devices comprising the burner.
•
The equipment will start as described in the chapter “OPERATION
DESCRIPTION”.
•
With the burner operating in the first stage, adjust now the amount of
air necessary for ensuring efficient combustion.
•
We recommend keeping the air quantity at a low level when working
in the first stage output to ensure perfect ignition even in the most
difficult conditions.
•
After adjusting the first stage air, disconnecting the current from the
main switch, close the electric circuit commanding the second stage
activation and move the switch on the electrical panel to second
stage.
•
If the electrical panel does not have the first and second stage
switch, connect the terminals of the 2nd stage thermostat with each
other on the boiler terminal block.
•
**NT** set the second stage air damper opening at the position
considered suitable for the desired fuel delivery.
•
Now the equipment is activated again and will automatically switch to
the second stage according to the program set by the programmer.
•
Regulate the air quantity to ensure a good combustion.
•
Check combustion with special instruments.
•
If the appropriate instruments are not available, judgement can be
based on the colour of the flame.
•
Regulate to obtain a light orange flame avoiding a red flame with
smoke, or a white flame with air excess.
•
Air regulation should be performed to allow a certain amount of
carbon dioxide (CO2) in the fumes, which may vary from a min. of
10% to a max. of 13% with a fume index not exceeding 6 of the
Bacharach scale.
CAUTION / WARNINGS
With a hydraulic jack,
When switching on the burner for the first time, shut downs may
be experienced during the transition from the first to the second
stage, due to the presence of air in the jack circuit.
Slightly loosen the nut blocking the jack pipe, carry out a few
operating cycles until there is fuel discharge from jack connection
nut.
Tighten the nut when the operation is finished.
22 / 40
0006160435_202112
ENGLISH
Содержание TBL 18P
Страница 2: ......
Страница 38: ...SCHEMI ELETTRICI TBL 18P TBL 26P 36 40 0006160435_202112 ITALIANO...
Страница 39: ...TBL 35P DACA 37 40 0006160435_202112 ITALIANO...
Страница 40: ...TBL 35P TBL 45P 38 40 0006160435_202112 ITALIANO...
Страница 42: ...40 40 0006160435_202112 ITALIANO...
Страница 78: ...WIRING DIAGRAMS TBL 18P TBL 26P 36 40 0006160435_202112 ENGLISH...
Страница 79: ...TBL 35P DACA 37 40 0006160435_202112 ENGLISH...
Страница 80: ...TBL 35P TBL 45P 38 40 0006160435_202112 ENGLISH...
Страница 82: ...40 40 0006160435_202112 ENGLISH...
Страница 83: ......