
•
After aligning the holes in the head unit with the ventilating body
with the screw and lock nut (16), screw in the four screws with their
washers (5) to anchor the head unit onto the ventilating unit.
ASSEMBLING THE GAS TRAIN
The EN 676 approved gas train is sold separately from the burner.
The gas train can be assembled in different ways: (8), (9), (10), (11),
(12).
Choose the most rational position for the set-up of the boiler room and
the position in which the gas pipeline arrives.
5
16
13 / 28
0006160267_202106
ENGLISH
Содержание TBG 900 ME
Страница 2: ......
Страница 26: ...SCHEMI ELETTRICI TBG 800 ME 900 ME 2000 ME 24 28 0006160267_202106 ITALIANO ...
Страница 27: ...TBG 800 ME 900 ME 2000 ME 25 28 0006160267_202106 ITALIANO ...
Страница 28: ...TBG 800 ME 900 ME 2000 ME 26 28 0006160267_202106 ITALIANO ...
Страница 29: ...TBG 800 ME 900 ME 2000 ME I1 I2 BA I4 I3 27 28 0006160267_202106 ITALIANO ...
Страница 54: ...WIRING DIAGRAMS TBG 800 ME 900 ME 2000 ME 24 28 0006160267_202106 ENGLISH ...
Страница 55: ...TBG 800 ME 900 ME 2000 ME 25 28 0006160267_202106 ENGLISH ...
Страница 56: ...TBG 800 ME 900 ME 2000 ME 26 28 0006160267_202106 ENGLISH ...
Страница 57: ...TBG 800 ME 900 ME 2000 ME I1 I2 BA I4 I3 27 28 0006160267_202106 ENGLISH ...
Страница 59: ......