8 / 18
0006081362_200806
E
N
G
L
I
S
H
APPLICATION OF BURNER TO BOILER
- Position insulating seal 3 on the sleeve, placing cord 2 between
the flange and the seal.
- slacken screws “6”,
adjust the position of connection flange “5” so that the com
-
bustion head penetrates the furnace up to the length recom
-
mended by the generator manufacturer.
- Fasten the burner 4 to the boiler 1 by means of the stud bolts,
washers and the nuts provided 7.
Note:Competely seal the space between the tube unit of the
burner and the hole in the refractory panel using suitable ma-
terials to do so.
ASSEMBLING THE GAS TRAIN
There are different ways of assembling the valve train, 8, 8a and 9
as shown in the drawing. The burner is supplied with the gas train
connection facing downward. If you wish to invert the direction of
train entrance to allow the valve set to be assembled in configuration
9, follow the procedure described in the section entitled: “Preparation
for connection with train turned upward”.
Choose the most rational position for the set-up of the boiler room
and the position in which the gas pipe arrives.
Содержание TBG 45
Страница 2: ......
Страница 25: ...93 97 0006081362_200806 3 A RU LGB 21 L1 N...
Страница 26: ...94 97 0006081362_200806 3 A RU LGB 21 L1 N...
Страница 27: ...95 97 0006081362_200806 3 A RU L1 N...
Страница 28: ...96 97 0006081362_200806 3 A RU TR SARI YE L MAV KAHV RE NG S YAH NOLU S YAH KABL0 L1 N...