22 / 44
0006080103_201309
• To check the UV photocell and lock, proceed as follows:
- Start the burner.
- After at least one minute from ignition remove the UV photocell
from its seat and simulate a flame failure by covering it with
a dark cloth. The burner flame must turn off, the equipment
must repeat the ignition phase from the beginning and shut
down as soon as the flame turns on.
- The equipment can only be released manually by pressing
the release button. The burner shutdown efficiency test must
be performed at least twice.
• Check that the boiler thermostats or pressure switches are
operating correctly (they must cause the boiler to shut down
when they intervene).
ENGLISH
Содержание 65805410
Страница 2: ......
Страница 40: ...38 44 0006080103_201309 WIRING DIAGRAM ENGLISH ...
Страница 41: ...39 44 0006080103_201309 ENGLISH ...
Страница 42: ...40 44 0006080103_201309 ENGLISH ...
Страница 43: ...41 44 0006080103_201309 ENGLISH ...
Страница 44: ...42 44 0006080103_201309 RAMPA PRINCIPALE ENGLISH ...
Страница 46: ...44 44 0006080103_201309 ENGLISH ...
Страница 84: ...38 44 0006080103_201309 ESPAÑOL ESQUEMA ELÉCTRICO ...
Страница 85: ...39 44 0006080103_201309 ESPAÑOL ...
Страница 86: ...40 44 0006080103_201309 ESPAÑOL ...
Страница 87: ...41 44 0006080103_201309 ESPAÑOL ...
Страница 88: ...42 44 0006080103_201309 ESPAÑOL RAMPA PRINCIPALE ...
Страница 90: ...44 44 0006080103_201309 ESPAÑOL ...
Страница 128: ...38 44 0006080103_201309 FRANÇAIS SCHÉMA ÉLECTRIQUE ...
Страница 129: ...39 44 0006080103_201309 FRANÇAIS ...
Страница 130: ...40 44 0006080103_201309 FRANÇAIS ...
Страница 131: ...41 44 0006080103_201309 FRANÇAIS ...
Страница 132: ...42 44 0006080103_201309 FRANÇAIS RAMPA PRINCIPALE ...
Страница 134: ...44 44 0006080103_201309 FRANÇAIS ...
Страница 135: ......