BURNER CONNECTION
TO THE BOILER
ASSEMBLING THE HEAD UNIT
- Position insulating seal 3 on the sleeve, placing
cord 2 between the flange and the seal.
- Loosen screws “6”, adjust the position of the
connection flange “5” so that the combustion
head penetrates the furnace up to the length
recommended by the generator manufacturer.
-
Referring to the diagram at the side, fit the rigid
pipe in the housing provided on the connection
flange and fasten it with the screw. This pipe will
be cut flush with the diffuser.
Fasten the burner 4 to the boiler 1 by means of
the stud bolts, washers and the nuts provided 7.
!
Completely seal the space between
the burner sleeve and the hole in
the refractory material inside the
boiler door with suitable material.
Rigid pipe fixing screw
Rigid pressure detection pipe in the combustion chamber
Pressure tap in
the combustion
chamber
Cut flush with diffuser
Pressure transmission pipe in the combustion chamber
ASSEMBLING THE GAS TRAIN
There are different ways of assembling the valve train
8, 8a, 9, as shown in the drawing.
Choose the most rational position for the set-up of
the boiler room and the position in which the gas
pipe arrives.
Содержание 17290015
Страница 2: ......
Страница 26: ...24 26 0006081483_201512 ITALIANO CORRENTE DI IONIZZAZIONE MINIMA 3 µA A RICHIESTA SCHEMA ELETTRICO ...
Страница 28: ...26 26 0006081483_201512 ITALIANO ...
Страница 52: ...24 26 0006081483_201512 ENGLISH WIRING DIAGRAM ...
Страница 54: ...26 26 0006081483_201512 ENGLISH ...
Страница 55: ......