www.balluff.com
BIS V-6108 PROFINET
Processor Unit
27
english
Automatic upload (IO-Link slave
→
IO-Link master) or download (IO-Link master
→
IO-Link
slave) can be switched on using this parameter.
For automatic upload, the parameter configuration is read when an IO-Link device is plugged in.
For automatic download, the parameter configuration is transmitted to the device when an
IO-Link device is plugged in.
Background:
The automatic upload makes it possible to read in the parameter configuration of a
correctly
configured device when plugging one in. If an IO-Link device has to be replaced, the previously
read in parameter configuration from the
old
device is transferred to the
new
device when it is
plugged in.
The "Upload" option can be disabled by having a valid parameter set read.
Configuration options:
– 8X
hex
: Switch on
– X1
hex
: Switch on upload
– X2
hex
: Switch on download
The connection of a BIS V-6108 to a Siemens S7 controller using "SIMATIC Manager" is shown
as an example. The exact procedure depends on the project planning software used.
To perform project planning on the PC, the GSD file for the module must be installed:
►
Open a new project.
►
Open the hardware configurator.
►
Select the "Tools | Install new GSD" menu command.
⇒
An "Install new GSD file" dialog will appear.
►
Select directory and GSD file.
⇒
The [Install] button only becomes active if a GSD file is selected.
►
Click on [Install].
⇒
The GSD file is installed.
⇒
A message appears once the process has finished.
►
Confirm the message and close the window.
►
Select the menu command "Tools | Update catalog".
⇒
The devices are displayed in the product tree.
Figure 6: Parameter configuration with a GSDML file
Parameter server,
optional
6.3 Integration into
Project Planning
Software
Installing the
GSD file
6
Startup