888.496.5137
b
all
h
og
g
oals.com
PAGE 3
NOTE:
ALLOW 3" OF THREAD
ABOVE 1st NUT
LOCATED BELOW
TEMPLETE AS
SHOWN
DETAIL# 18
ASSEMBLING
GROUND KIT
2
33
44
3
1
5
TEMPLETE
1st-NUT
HARDWARE IS THE SAME
FOR ALL FOUR SIDES
NUMBERED AS SHOWN.
INSTALLATION TIMELINE
ANCHOR SYSTEM INSTALLATION INSTRUCTIONS
Day 1:
Install anchor system as per the instructions below.
Day 2-4:
Allow the concrete to cure. *Cooler temperatures may require additional cure time
Day 5:
Complete assembly and installation of the system as per the instructions below.
Items required for anchor installation - not included
11 +/- - 80 lb. bags of concrete
1 - Post hole digger or gas powered auger
1 - Shovel
1 - Mortar hoe
2 - 1 1/8” Open end wrenches or adjustable wrenches
1 - Wheel barrow
1 - Garden hose
1 - Level
1 - Tape measure
1 - Concrete form (see note below)
3 - 36” long pieces of #40 reinforcement bar
STEP 1 - ASSEMBLE ANCHOR
Locate and assemble the (#1) 9” x 9” bolt pattern anchor kit as shown in
Image 1 using the supplied hardware located within the anchor box.
Item Description
1
Ascent Series 9” x 9” bolt pattern template
2
L-Bolt - (4) required
3
3/4” Nut - (12) required
4
3/4” Flat Washer - (8) required
5
*Baseplate portion of the pole.
Note:
The (#5) baseplate portion of the pole is shown to illustrate the
final assembly of the pole and anchor. The pole is not required to set
the anchor.
Image 1
DAY 1
Содержание Ascent Apex
Страница 1: ...Ascent series Goals Summit pinnacle Apex ...