Cabling Design and Installation Recommendations

 (cont.)

Recommended Cable Type

The ring circuit must be cabled in a 4-core with screen fire rated cable. FP200, or equivalent, is recommended.
MICC can be used, but identification of the individual conductors for correct phasing of conductor pairs (which is
essential to prevent damage to the equipment) can be difficult with this type of cable.
The conductor cross-sectional area must be chosen depending on the length of cable runs and the number of
Call Point Remote Units on each circuit.
Please contact our Technical Sales team on +44(0)1892 664422 for free advice and assistance with your
cabling design and choice of cable.

Button Allocation

The first Call Point Remote Unit on the loop counting from the ‘A’ connection of the upper termination panel at
the Master Control Panel is button number 1; the next on the loop is number 2, etc.  Each button panel can
serve up to sixteen Call Point Remote Units that are sequentially connected on a circuit.

As a simple example, please refer to Configuration Example 1 (page 4). The sixteen Call Point Remote Units in
this system are related to the Control Panel buttons as follows: -

Call Point

Remote

Unit

Button

Call Point

Remote

Unit

Button

1

1

9

9

2

2

10

10

3

3

11

11

4

4

12

12

5

5

13

13

6

6

14

14

7

7

15

15

8

8

16

16

For a more complex example, please refer to Configuration Example 5 (on the previous page). The 89 Call
Point Remote Units might be related to the Master Control Panel buttons as follows: -

Button Panel 1

Button Panel 2

Button Panel 3

Button Panel 4

Call Point

Remote

Unit

Button

Call Point

Remote

Unit

Button

Call Point

Remote

Unit

Button

Call Point

Remote

Unit

Button

1

1

17

1

33

1

49

1

2

2

18

2

34

2

50

2

3

3

19

3

35

3

51

3

4

4

20

4

36

4

52

4

5

5

21

5

37

5

53

5

6

6

22

6

38

6

54

6

7

7

23

7

39

7

55

7

8

8

24

8

40

8

56

8

9

9

25

9

41

9

57

9

10

10

26

10

42

10

58

10

11

11

27

11

43

11

59

11

12

12

28

12

44

12

60

12

13

13

29

13

45

13

61

13

14

14

30

14

46

14

62

14

15

15

31

15

47

15

63

15

16

16

32

16

48

16

64

16

Etc.

This sequence of allocations between buttons and Call Point Remote Units can be modified (for example, where
the positions of buttons on the panel are to more closely mimic the real physical positions of the Call Point
Remote Units). This requires re-configuring of the Control Panel button boards (as described in part 3 of
‘Commission The System’).

Please contact our Technical Sales team on +44(0)1892 664422 for free advice and assistance.

Содержание VIGIL AssureCare

Страница 1: ...can press the Call button on a Call Point Remote Unit to call and speak with a Fire Officer or Building Manager The Fire Officer or Building Manager uses a press to talk telephone handset at their ded...

Страница 2: ...o conform to the following EC standards EMC EN 55103 1 Environment E1 EN 55103 2 E5 Safety EN 60065 Failure to install or use the equipment in the manner described in the product literature will inval...

Страница 3: ...e cabling a further 200m For systems with larger numbers of Call Point Remote Units multiple circuits ring sections are used The terminations of each circuit are made at the Main Control Panel to form...

Страница 4: ...ring circuit The terminal blocks labelled TB1 are located in the top of the Control Panel enclosure and the terminations for Call Point Remote Units 1 and 16 are also shown in detail CAN H CAN L V 0V...

Страница 5: ...ocument ref IBVCP issue 1 Page 5 of 22 Cabling Design and Installation Recommendations cont Configuration Example 2 TB1 FIRST BVCP BVCP BVCP BVCP BVCP BVCP BVCP BVCP BVCP BVCP BVCP BVCP BVCP LAST BVCP...

Страница 6: ...bling Design and Installation Recommendations cont Configuration Example 3 Typical Connection Diagram Up To 48 Units TB1 FIRST BVCP BVCP BVCP BVCP BVCP BVCP BVCP BVCP BVCP BVCP BVCP BVCP LAST BVCP BVC...

Страница 7: ...d Installation Recommendations cont Configuration Example 4 Typical Connection Diagram Up To 64 Units TB1 FIRST BVCP BVCP BVCP BVCP BVCP BVCP BVCP BVCP BVCP BVCP BVCP BVCP LAST BVCP BVCP BVCP BVCP BVC...

Страница 8: ...E BOARD 64 way SLAVE 2 INTERFACE BOARD 16 way MASTER CONTROL PANEL 96 way 800m MAX 25 TELEPHONES These distances have been calculated for 1 5sqmm conductors Please contact our Technical Sales team on...

Страница 9: ...system are related to the Control Panel buttons as follows Call Point Remote Unit Button Call Point Remote Unit Button 1 1 9 9 2 2 10 10 3 3 11 11 4 4 12 12 5 5 13 13 6 6 14 14 7 7 15 15 8 8 16 16 For...

Страница 10: ...Installing Control Panels 47 0 0 0 363 0 13 5 396 5 0 0 52 5 385 0 1 Open the glazed door and remove the M6 screw s from the right hand side of the Control Panel 2 To allow access to the two top locat...

Страница 11: ...es For Mounting 128 Zone Control Unit 4 wire Ring IN 4 wire Ring OUT View of cable terminations to Control Unit Termination Panel Note In this example the ring consists of one circuit of Call Point Re...

Страница 12: ...o 1 4m from the floor but at 900mm to 1 2m in refuges 2 At the rear of the Remote Unit remove the screw to release the bracket retaining the blue termination block 3 Terminate all cables at the termin...

Страница 13: ...re the system and confirm it is functioning correctly Commissioning must be carried out on a new system or if a Remote has been added or replaced To commission this product you will need A small flat...

Страница 14: ...ll Point Remote Units See following table Terminals B Terminals C CAN H Connect to CAN H CAN L Connect to CAN L 4 Connect mains power to the Control Panel but do not connect the batteries 5 At the Con...

Страница 15: ...until the yellow indicator by button 1 starts to flash then release it Press and release the Fault Accept button to silence the fault buzzer 14 During commissioning a special code is sent round the ri...

Страница 16: ...Remote Unit in turn check that its indicator is pulsing before making a call to the control panel to confirm correct operation and the Call Point Remote Unit s number Master Control Panel System 65 to...

Страница 17: ...twice as fast as the others The offset is 0 to15 and the range 1 to 16 To change the settings the first button push sets the offset the next sets the range and the next toggles between master and nor...

Страница 18: ...Document ref IBVCP issue 1 Page 18 of 22...

Страница 19: ...sert Labels cont Slide the strips cut from the Zone Insert template under the membrane at the positions shown in the picture They can be inserted from either side Note Zone Insert Template is also ava...

Страница 20: ...flashing changes when you press the buttons If it does then the described fault is one of those at the Call Point Remote Unit Description of Call Point Remote Unit Controls and Indicators Volume Set a...

Страница 21: ...inate when the Battery voltage is low Charger fault LED Will illuminate if the batteries are unable to hold their charge or if they are not fully charged after 24 Hours charging Reset must be pressed...

Страница 22: ...ll Communications Ltd reserves the right to make changes to product specification without notice or liability Information contained in this document is believed to be accurate however no representatio...

Страница 23: ...emergency call point system which has been developed in accordance with BS5839 part 9 and BS5588 The system is a fully monitored and battery backed communication network and has capabilities to funct...

Страница 24: ...ng mode then press and hold the button on handset base or SPEAK on the control panel Avoid distortion of your speech by keeping the SPEECH LEVEL LEDs below the maximum red indication You will be unabl...

Страница 25: ...he Remote Unit will ring and so will the handset s at the Control Panel s When the person at the control panel answers wait for them to finish speaking before trying to speak back they cannot hear you...

Страница 26: ...y is given and Baldwin Boxall Communications Ltd assumes no liability with respect to the accuracy of such information Use of Baldwin Boxall Communications Ltd products as critical components in life...

Страница 27: ...de as follows To ensure correct operation both JP1 and JP2 must be fitted If the fire panel connections or the Test connections to the Break Glass Unit are not in place the System will Commission corr...

Отзывы: