0AGE
54751_97_B
TB1
HTR2
J101
J100
HTR1
G
N
J50
T1
J1
J2
J10
JJ
J58
J58
J71
J46
J46
J25
5
J2
66
J72
72
J90
J90
J28
8
J28
J1
A
J2A
J32
2
J52
J51
J
F6, T30A 480V
AV
OZONE
PUMP 1
OPT. BLWR/PUMP 2
CIRC. PUMP
K1
K3
K4
K6
E.GND
E
.GND
J47
G
N
G
N
G
N
J29
J23
G
N
J17/26
K2
K9
J20
G
N
W2
1
2
3
4
W1
Balboa
BALBOA INSTRUMENTS, INC.
GS500Z
COPYRIGHT 2006
MADE IN U.S.A.
P/N 22015_A
J60
J44
J18
1
1
1
1
1
1
1
J7
J8
EXT RLY
TST
J6
SEN A
VAC
SEN B
J22
J43
AUX F
J13
J11
J12
J19
F2
S1
SWITCHBANK A
K8
K5
C9
U4
F3A 250V
F7
F1
F10A 250V
F4, T0.3A 250V
Pbb
PPP
F3
GS5xxDZ mode
G
R
B
W
J1
1
J7
J6
F30A 480V
X-P332 CE
PN 55138
P/N 22909 REV B
2-Spd P2
1-Spd P3
3.0 kW
Heater rated @ 230V
J11 must be Jumpered
3.0kW
Spa
Light
Audio Visual
Circ Pump
DIP switch A9 must be ON if Circ Pump is installed.
Ozone
2-Spd P1
Wiring Configuration and DIP Settings
Setup 2
s 60UMP3PEED
s 60UMP3PEED
s 60UMP3PEED
s 63PA,IGHT
s 6/ZONE
s 6!<6
(Stereo)
s 6K7(EATER
s $ELUXE-AIN0ANEL
s 6#IRC0UMPOPTIONAL
A1, Test Mode OFF
A2, See Table 1
A3, N/A
A7, J17/26 Disabled
A10, See Table 1
A5, NA when A9 if OFF
Panel Button Assignments
1=Time
2=Mode/Prog
3=Temp Up
4=Temp Down
5=Light
6=Pump 1
7=Pump 2
8=Unused
Panel Button Positions
1
2
3
4
8
6
5
7
100
94
39
SSID #
J11
3.0kW
Heater
J12
1
2
3
GS520DZ
Software
Memory
Reset
J43
A8, Degrees C
A7, J17/26 Enabled
8=J17/26
A6, 50 Hz
A5, 2-speed P1
Neutral (Common) AC Connections
Special AC Connections
Line AC Connections
10 Volt Connections
Relay Control Wires
Wiring Color Key
Typically Line voltage
Typically Line voltage for 2-speed pumps
Neutral (Common)
Ground
Note flat sides in connector
Board Connector Key
1
2
3
4
WARNING:
Main Power to system should be turned OFF BEFORE adjusting DIP switches.
WARNING:
Persistent Memory (J43) must be RESET to allow new DIP switch settings to take effect. (See Persistent Memory page)
H
I
Pot Testing Note:
Disconnect slip terminal with green
wires from J90 prior to performing
HiPot test. Failure to disconnect may
cause a false failure of the test.
Reconnect terminal to J90 after
successful completion of HiPot test.