Note:
1. Recommended minimum clearances for human technician.
2. Minimum clearances for safe operation.
Y-600, Y-800, DS-805 16 (406mm)
Y-600, Y-800, DS-805 25 (635mm)
D-125 12 (305mm)
D-125 29 (737mm)
Left
Side
Access
Cover
Left
Side
Access
Cover
17 (432mm)
33
(838mm)
Flue
Ventilation Hood
FC516/FC616
43 1/4 (1099mm)
FC816
51 (1295mm)
3 (76mm) See Note 2
See Note 1
30 3/4
(781mm)
22 3/4
(578mm)
20
(508mm)
LEFT SIDE VIEW - SIDE CONTROLS UNIT
3/4” NPT Gas
Connection
115VAC, 15Amp
NEMA 5-15P
Electrical
Connection
Ventilation Hood
5 ½ (140mm)
Flue
33 (838mm)
9 1/4 (237mm)
36 (914mm)
17
(430mm)
Side
Access
Cover
30 3/4 (782mm)
3 (76mm) SEE NOTE 2
FC616 43 (1093mm)
FC816 51 (1296mm)
FC516 43 (1093mm)
20 (508mm)
SEE NOTE 1
LEFT SIDE VIEW - FRONT CONTROLS UNIT
RECOMMENDED CLEARANCES (ALL MODELS)
18
30
MINIMUM CLEARANCES
Right
0
0
1
25
Left
0
0
3
76
Rear
2
51
3
76
Front Flue Area
Enclose with Non-combustible materials
Inches
mm
Inches
mm
Non-Combustible
Combustible
Construction
Construction
Содержание FC-516
Страница 31: ...31 Notes...