Baker BX Скачать руководство пользователя страница 9

 
 

 

 

Baker Band Resaw - Rev 1, 09/08; 

WWW.BAKER-ONLINE.COM

 

9  

Control of Hazardous Energy – (Lockout / Tagout) 

Lockout / Tagout (LOTO) refers to specific practices and procedures to safeguard employees 
from the unexpected energy, startup of machinery/equipment, or the release of hazardous 
energy during service or maintenance activities.  
 
This requires that a designated individual turn off and disconnect the machinery/equipment 
from its energy source(s) before performing service or maintenance and that the authorized 
employee(s) lock and tag the energy-isolating device(s) to prevent the release of hazardous 
energy and take steps to verify that the energy has been isolated effectively. 

 

List of Related Terms 

Affected 
Employee 

An employee whose job requires them to operate a machine or piece of 
equipment on which service or maintenance is being performed.

 

Authorized 
Employee 

A person who locks or implements a tagout system procedure on machines 
or equipment to perform service or maintenance on that machine or 
equipment. An authorized employee and an affected employee may be the 
same person when the affected employee's duties also include performing 
service or maintenance.  

 

Energy 
Source 

Any source of electrical, mechanical, hydraulic, pneumatic, chemical, thermal, 
or other energy.

 

Lockout 

The placement of a lockout device (such as a lock) on an energy-isolating 
device, in accordance with an established procedure that ensures the device 
and the equipment cannot be operated until the lockout device is removed.  

Servicing 
and / or 
Maintenance 

Workplace activities such as constructing, installing, setting up, adjusting, 
inspecting, modifying, maintaining or servicing machines or equipment. 
These activities include lubrication, cleaning or un-jamming of machines or 
equipment, and making adjustments or tool changes where the employee 
may be exposed to the unexpected energy, start-up of equipment or release 
of hazardous energy. 

Tagout 

The placement of a tagout device (such as a tag) on an energy-isolating 
device, in accordance with an established procedure that ensures the device 
and the equipment may not be operated until the tagout device is removed.   

 
 

 

Example of lockout tags, lockout 

hasp and keyed lock 

The Fatal Five Main Causes of 

Lockout/Tagout Injuries 

1.  Failure to stop equipment 
2.  Failure to disconnect from a 

power source 

3.  Failure to dissipate (bleed, 

neutralize) residual energy 

4.  Accidental re-starting of 

equipment 

5.  Failure to clear work areas 

before re-starting 

Содержание BX

Страница 1: ...Ba an nd d R Re es sa aw w U Us se er r M Ma an nu ua al l Ellington Industrial Supply Inc P O Box 128 Ellington Missouri 63638 USA Web site www baker online com E mail info baker online com Phone 57...

Страница 2: ...Power and Utilities Requirements 11 Operator Training 12 5 CHANGING BLADES 13 Removing Blade 13 Installing New Blade 13 Blade Tracking 14 Checking the Tracking 14 Drive Wheel Adjustments 15 Idler Whee...

Страница 3: ...e information contained in this manual FAILING TO DO SO MAY RESULT IN SERIOUS INJURY Machine Purpose The Baker B BX Band Resaw was designed to have a two point feed works allowing for running random w...

Страница 4: ...and blade used for the initial breakdown of a log Kerf The groove or thickness of the path cut by the saw teeth the total amount of sawdust removed during a single cut Lift Point A point where pressur...

Страница 5: ...machine must adhere to such regulations Machine Specifications and Requirements Power B 20HP TEFC BX 30HP TEFC Feedworks Conveyor Motor Driven by main engine Capacities B 6 x 12 6 wide conveyor BX 12...

Страница 6: ...ustrial Supply Inc does not warranty this machine to meet any other requirements or jurisdiction of any electrical or safety codes of any other state municipality other country or jurisdiction The pur...

Страница 7: ...ble for special indirect incidental or consequential damages however arising including but not limited to the loss of earnings or the cost of downtime Service Policy In the event that you have any pro...

Страница 8: ...IN MOVING PARTS ALWAYS WEAR SAFETY GLASSES AND HEARING PROTECTION AVOID KICK BACK BY KNOWING WHAT CONDITIONS CAN CREATE IT CHECK DAMAGED PARTS AND REPAIR OR REPLACE THEM IMMEDIATELY NEVER LEAVE MACHI...

Страница 9: ...e performing service or maintenance Energy Source Any source of electrical mechanical hydraulic pneumatic chemical thermal or other energy Lockout The placement of a lockout device such as a lock on a...

Страница 10: ...ant to highlight the unique and special features of the Baker B BX Band Resaw Footprint B Model single shown Adjustable Head Rig Powered Hold Down Blade Tensioning T handle Head Rig and Cowling Door C...

Страница 11: ...afety strap to avoid tip over Transport machine to the installation site Machine Positioning Placement Leveling Alignment For optimum performance designate a solid and level foundation that is covered...

Страница 12: ...of work Be sure personnel are properly trained and safety rules are clearly understood before operating or performing maintenance Operator Machine Guards Devices Instructions F FR RE EE E T TR RA AI...

Страница 13: ...hand Blade should be loose enough to be removed Push blade back and off of the right wheel Pull blade out of guides and remove If blade is not loose enough to remove from right wheel go back to the 3r...

Страница 14: ...ng appears to be correct after the above procedure your saw will cut without problems due to blade tracking However now rotate the idler wheel several rotations clockwise Check the blade in the same w...

Страница 15: ...bolt on the backside of the square tube underneath the motor is used for horizontal adjustments Use these bolts to tilt the idler wheel so that it is lined up with the face of the drive wheel When the...

Страница 16: ...to come forward turn the horizontal adjuster bolt counter clockwise Of course you ll need to loosen the lock nut first And don t forget to retighten the lock nut when finished adjusting Manually turn...

Страница 17: ...t of the blade and the other about 5 inches behind the blade Set the blade height to the thickness of the metal plates Use a straight edge to lie across the metal plates and over the blade Be sure the...

Страница 18: ...hem to adjust your front to back setting Side to Side Adjustments To cut quality lumber the blade must run parallel to the conveyor This is preset at the factory However if it ever gets knocked out yo...

Страница 19: ...e block as a reference set this surface at a right angle to the conveyor Use this to make sure the blade is running parallel to the conveyor When set properly lock down the Tilt Adjusters and retighte...

Страница 20: ...nhibiting the blades movement Eventually you will have to replace worn guide wheels and plates You should always keep spare guide wheels and plates on hand Under normal use guide plates should last ab...

Страница 21: ...find the best speed to run your wood types Hydraulics The Feedworks uses a hydraulic pump driven off of the main drive motor Dextron II Transmission fluid is recommended Conveyor Belts If the conveyor...

Страница 22: ...n place while it is being cut It can be placed closer to or further away from the blade by loosening the 2 front to back bolts on top of the hold down assembly Another 2 bolts on the front of the asse...

Страница 23: ...standard Baker BX uses the following blades 14 2 x 1 x 035 2T Woodmaster C Band Blades 14 2 x 1 x 035 also available NOTE 1 1 4 guide plates as well as other blade widths thickness and tooth spacing a...

Страница 24: ...lean with flammable or combustible materials Follow applicable codes and standards with regards to o Ventilation and monitoring of work area for excessive accumulation of hazardous vapors o Wearing pe...

Страница 25: ...be adjusting the head rigs See Cutting Angle Adjustment Boards that look like the image below are almost always problems with the blade A blade with more set on the top or with dull bottom teeth will...

Страница 26: ...QTY 2 per Head 111013 5VX710 Drive Belt QTY 2 101275 Bearing for 28 in Wheel 4 Bolt Hole QTY 1 per Head 171077 Spindle Nut N 11 QTY 1 181015 Hydraulic Pump If equipped w hyd Feedworks QTY 1 181019 Hyd...

Страница 27: ...Baker Band Resaw Rev 1 09 08 WWW BAKER ONLINE COM 27 Wiring Diagrams High Voltage...

Страница 28: ...Baker Band Resaw Rev 1 09 08 WWW BAKER ONLINE COM 28 Wiring Diagrams continued Low Voltage...

Отзывы: