Baker Hughes Masoneilan SVI3 Скачать руководство пользователя страница 2

2  |  Baker Hughes

© 2021 Baker Hughes Company. All rights reserved.

THESE INSTRUCTIONS PROVIDE THE CUSTOMER/OPERATOR WITH 

IMPORTANT PROJECT-SPECIFIC REFERENCE INFORMATION IN ADDITION 

TO THE CUSTOMER/OPERATOR’S NORMAL OPERATION AND MAINTENANCE 

PROCEDURES. SINCE OPERATION AND MAINTENANCE PHILOSOPHIES VARY, 

BAKER HUGHES COMPANY (AND ITS SUBSIDIARIES AND AFFILIATES) DOES 

NOT ATTEMPT TO DICTATE SPECIFIC PROCEDURES, BUT TO PROVIDE BASIC 

LIMITATIONS AND REQUIREMENTS CREATED BY THE TYPE OF EQUIPMENT 

PROVIDED. 
THESE INSTRUCTIONS ASSUME THAT OPERATORS ALREADY HAVE A 

GENERAL UNDERSTANDING OF THE REQUIREMENTS FOR SAFE OPERATION 

OF MECHANICAL AND ELECTRICAL EQUIPMENT IN POTENTIALLY HAZARDOUS 

ENVIRONMENTS. THEREFORE, THESE INSTRUCTIONS SHOULD BE 

INTERPRETED AND APPLIED IN CONJUNCTION WITH THE SAFETY RULES 

AND REGULATIONS APPLICABLE AT THE SITE AND THE PARTICULAR 

REQUIREMENTS FOR OPERATION OF OTHER EQUIPMENT AT THE SITE.
THESE INSTRUCTIONS DO NOT PURPORT TO COVER ALL DETAILS OR 

VARIATIONS IN EQUIPMENT NOR TO PROVIDE FOR EVERY POSSIBLE 

CONTINGENCY TO BE MET IN CONNECTION WITH INSTALLATION, OPERATION 

OR MAINTENANCE. SHOULD FURTHER INFORMATION BE DESIRED OR 

SHOULD PARTICULAR PROBLEMS ARISE WHICH ARE NOT COVERED 

SUFFICIENTLY FOR THE CUSTOMER/OPERATOR’S PURPOSES THE MATTER 

SHOULD BE REFERRED TO BAKER HUGHES.
THE RIGHTS, OBLIGATIONS AND LIABILITIES OF BAKER HUGHES AND THE 

CUSTOMER/OPERATOR ARE STRICTLY LIMITED TO THOSE EXPRESSLY 

PROVIDED IN THE CONTRACT RELATING TO THE SUPPLY OF THE EQUIPMENT. 

NO ADDITIONAL REPRESENTATIONS OR WARRANTIES BY BAKER HUGHES 

REGARDING THE EQUIPMENT OR ITS USE ARE GIVEN OR IMPLIED BY THE 

ISSUE OF THESE INSTRUCTIONS.
THESE INSTRUCTIONS ARE FURNISHED TO THE CUSTOMER/OPERATOR 

SOLELY TO ASSIST IN THE INSTALLATION, TESTING, OPERATION, AND/OR 

MAINTENANCE OF THE EQUIPMENT DESCRIBED. THIS DOCUMENT SHALL NOT 

BE REPRODUCED IN WHOLE OR IN PART WITHOUT THE WRITTEN APPROVAL 

OF BAKER HUGHES.

Содержание Masoneilan SVI3

Страница 1: ...Masoneilan SVI 3 Digital Positioner Quick Start Guide Rev A Baker Hughes Data Classification Public...

Страница 2: ...REQUIREMENTS FOR OPERATION OF OTHER EQUIPMENT AT THE SITE THESE INSTRUCTIONS DO NOT PURPORT TO COVER ALL DETAILS OR VARIATIONS IN EQUIPMENT NOR TO PROVIDE FOR EVERY POSSIBLE CONTINGENCY TO BE MET IN...

Страница 3: ...ng Procedure of SVI3 on Rotary Control Valves 6 8 Mounting Procedure of SVI3 on Reciprocating Control Valves 9 11 Tubing and Air Supply to SVI3 12 SVI3 Wiring Procedure 13 14 Local Commissioning with...

Страница 4: ...can lead to injury or death Total compliance with all DANGER WARNING and CAUTION notices is required for safe operation This is the safety alert symbol It alerts you to potential personal injury haza...

Страница 5: ...ivers accurate responsive and reliable positioning performance Note Refer to https valves bakerhughes com resource center for the following Free trial of ValVue3 and SVI3 DTM software mentioned in Sec...

Страница 6: ...Camflex Tools required 3 16 Hex Key 5 32 Hex Key 3mm 4mm 5mm Hex Key 1 Attach the SVI3 rotary mounting bracket to the valve actuator with two 5 16 18 UNC flat head cap screws and tighten using 3 16 H...

Страница 7: ...a wrench as shown across the top surface of the bracket Adjust height as necessary to make sure the magnet assembly is flush with the top of the mounting bracket Wrench tight the two M6 screws on the...

Страница 8: ...20 mm socket head cap screws using 6mm Hex Key 4 Ensure that the V Seal makes contact with the skirt around the alignment ring on the SVI3 SVI3 Mounting Bracket Rotary Actuator Figure 5 Camflex with...

Страница 9: ...m 5mm 6mm Hex Key 1 Mount the standard reciprocating mounting bracket to the valve with two 5 16 18 UNC cap screws and apply wrench tight Mounting hole selection for the bracket is defined in Table 2...

Страница 10: ...uator Size Stroke Mounting Hole Lever Hole Turnbuckle Length 6 and 10 0 5 0 8 12 7 20 32 mm A A 1 25 31 75 mm 10 0 8 1 5 30 32 38 1 mm B B 16 0 5 0 8 12 7 20 32 mm B A 2 90 73 66 mm 16 0 8 1 5 20 32 3...

Страница 11: ...read the turnbuckle onto the left hand threaded rod end approximately two turns Attach the left hand threaded rod end to the take off rod with 1 4 20 UNC nut and thread the left hand lock nut onto the...

Страница 12: ...the tubing and all the fittings are leak free 3 Confirm that the air regulator is adjusted to the lowest setting prior to turning on air supply 4 Turn on the air supply and adjust the air regulator to...

Страница 13: ...le cable gland as per the end user country regulations Lock Screw End Cover 1 2 NPT Housing Entries Figure 15 SVI3 Digital Positioner front view SVI3 Wiring Procedure The SVI3 uses a 4 20mA signal wit...

Страница 14: ...tion of I O Two solid state switches SW 1 and SW 2 4 20 mA output to support position retransmit functions Digital Input DI Remote position sensor input Process Variable PV Figure 17 Optional Modual C...

Страница 15: ...shown in the digital display Press and hold this button continuously the displayed value decreases at faster rate Launch the Smart Cal routine by following the process detailed below This button is i...

Страница 16: ...pany All rights reserved The SVI3 pushbutton menu structure helps to perform device operations such as configuration calibration viewing data and viewing errors Note Refer SVI3 IOM for full button men...

Страница 17: ...or the software installation HART Modem and device configuration procedures 1 Upon successful device connection and DTM launch the Online Parameters are displayed in the DTM screen 2 For device config...

Страница 18: ...al for more details Click Setup Wizard on the left pane In the Setup Wizard screen choose the appropriate Air Action and the calibration will be performed automatically Put the device back to Normal m...

Страница 19: ...VI3 DD files to the handheld communicator 2 Connect the handheld communicator as shown in Figure 14 and turn the power ON the home screen will be displayed as below 3 Select Online menu in the home sc...

Страница 20: ...erations such as Change Device Mode Run Find Stops and Auto Tune 5 For device configuration or to run Find Stops and Auto Tune the device should be in the Setup mode Click Setup in the Set Mode Target...

Страница 21: ...21 Baker Hughes Company All rights reserved Masoneilan SVI3 Quick Start Guide 21 6 Perform Find Stops and Auto Tune using the following screens for the device setup Figure 28 Run Find Stops and Auto T...

Страница 22: ...22 Baker Hughes 2021 Baker Hughes Company All rights reserved Notes...

Страница 23: ...2021 Baker Hughes Company All rights reserved Masoneilan SVI3 Quick Start Guide 23 Notes...

Страница 24: ...s of Baker Hughes Company Other company names and product names used in this document are the registered trademarks or trademarks of their respective owners BHMN SVI3 QSG 34605A 0321 03 2021 Tech Fiel...

Отзывы: