Masoneilan 41005 Series Globe Valves with API-6A Capabilities Instruction Manual
|
25
© 2023 Baker Hughes Company. All rights reserved.
10. Release the pressure in the actuator. Use pointer (7) to
set the travel scale (9) to the actuator supply pressure so
that the two stem connectors come into contact. Then
tighten the socket head cap screws (5), hex nut (1), and
lock nut (32).
11. Shut off the closed valve pressure and check that
operation is correct.
Table 7 - Position of Top Stem Connector
Actuator
Size
Travel
“X”
Actuator 87
“X”
Actuator 88
in
mm
in
mm
in
mm
10
0.8
20
5.12
130.0
4.62
117.3
10
1.5
38
5.44
138.2
16
0.8
20
8.00
203.2
7.02
178.3
16
1.5
38
8.50
228.6
16
2.0
51
9.28
235.7
16
2.5
63.5 9.50
241.3
23
0.8
20
8.25
209.5
23
1.5
38
8.62
218.9
23
2.0
51
9.12
231.6
23
2.5
63.5 9.59
243.6
Type 51/52/53 Cylinder Actuators
Connecting Double Acting (Model 51) (Figures 10 & 11)
1. Install actuator on the valve body with drive nut.
2. Connect manual loading panel tubing to the Top Plate
(17).
3. Apply required air pressure through the manual loading
panel to completely extend the actuator stem.
4. Reconnect manual loading panel tubing from the Top
Plate (17) to the Yoke (1), which is integrated into the
bottom plate connection.
5. Retract the actuator stem either pneumatically or with
a handwheel approximately .1” (2mm) using the visual
stroke scale as shown in Figure 7.
Figure 7 - 51/52/53 Cylinder Actuator
6. Assemble the Split Clamp (22).
Note: If the split clamp does not engage with both
stems, then retract the actuator stem until alignment
and engagement is achieved.
Figure 8 - 51/52/53 Cylinder Actuator
7. Assemble and tighten Indicator Arm (23), Spring Lock
Washers (25), and Hexagon Bolts (24).
8. Line up the indicator plate (26), with Indicator arm (23)
and check actuator for proper operation.
Connecting Air to Extend (Model 52) (Figure 9)
1. Install actuator on the valve body with drive nut.
2. Connect manual loading panel tubing to the top plate
(17).
3. Apply required air pressure through the manual loading
panel to completely extend the actuator stem.
4. Extend the actuator stem either pneumatically or with
a handwheel approximately .1” (2mm) using the visual
stroke scale as shown in Figure 7.
5. Assemble the Split Clamp (22).
Note: If the split clamp does not engage with both
stems, then extend the actuator stem until alignment
and engagement is achieved.
Make sure the valve is fully extended.
6. Assemble and tighten Indicator Arm (23), Spring Lock
Washers (25), and Hexagon Bolts (24).
7. Line up the indicator plate (26), with Indicator arm (23) and
check actuator for proper operation.
Connecting Air to Retract (Model 53) (Figure 10)
1. Install actuator on the valve body with drive nut.
2. Connect manual loading panel tubing to the yoke (1),
which is integrated into the bottom plate connection.
3. Retract the actuator stem either pneumatically or with
a handwheel approximately .1” (2mm) using the visual
stroke scale as shown in Figure 7.
4. Assemble the Split Clamp (22).
Note: If the split clamp does not engage with both
stems, retract the actuator stem until alignment and
engagement is achieved.
Make sure the valve is fully extended.
Содержание Masoneilan 41005 Series
Страница 48: ...48 Baker Hughes 2023 Baker Hughes Company All rights reserved Figure 15 Trim Type and Packing Detail...
Страница 50: ...Notes...
Страница 51: ...Notes...