Copyright 2022 Baker Hughes Company.
English–PV 62X / PV 62X-IS Instruction Manual | 13
7.3 Cleaning
Clean the case with a moist, lint-free cloth and a weak detergent. Do not use solvents or abrasive
materials.
7.4 Draining the Unit (PV
623G / PV
623
-
IS Models)
7.5 Leak Test
15 gives the maximum leak rates for each type of PV
62XG / PV
62X
-
IS
pressure station.
7.5.1 Preparation
To do a leak test, we recommend these items:
1. A DPI
620G / DPI
620G
-
IS calibrator.
2. The applicable PM
620 / PM
620
-
IS module for the pressure station:
•
PV
621G / PV
621
-
IS models: P/N PM620
-
13G / PM620S
-
13G (20
bar)
•
PV
622G / PV
622
-
IS models: P/N PM620
-
165G / PM620S
-
165G (100
bar)
•
PV
623G / PV
623
-
IS models: P/N PM620
-
23A / PM620S
-
23A (1000
bar)
3. An applicable blanking adaptor to seal the test port connection.
4. PV
623G / PV
623
-
IS models only: Demineralized water.
7.5.2 Procedure
1. Seal the test port connection with the blanking plug.
2. Connect the applicable PM
620 / PM
620
-
IS module:
•
PV
621G / PV
621
-
IS models: P/N PM620
-
13G / PM620S
-
13G (20
bar)
•
PV
622G / PV
622
-
IS models: P/N PM620
-
165G / PM620S
-
165G (100
bar)
•
PV
623G / PV
623
-
IS models: P/N PM620
-
23A / PM620
-
23A (1000
bar)
3. Connect a DPI
620G / DPI
620G
-
IS calibrator and set the power on.
4. Do the test for maximum pressure or maximum vacuum.
7.5.2.1 Maximum Pressure Test
1. Use the applicable procedure for the pressure station to set the maximum pressure:
•
PV
621G / PV
621
-
IS models: Chapter
3 Set the pressure to 20
bar.
•
PV
622G / PV
622
-
IS models: Chapter
4 Set the pressure to 100
bar.
•
PV
623G / PV
623
-
IS models: Chapter
5 Set the pressure to 1000
bar.
2. Set the DPI
620G / DPI
620G
-
IS calibrator to do a Leak Test:
•
Channel Settings: Units = Bar; Utility = Leak Test
•
Settings: Test Time = 00:01:00 (1 minute)
3. Let the pressure become stable for 1
minute.
CAUTION
To prevent damage to the pressure station, do not let dirt get into
the pressure mechanism. Before you connect equipment, make sure it is clean.
CAUTION
Ice in the pressure mechanism can cause damage. If the
temperature is less than 4°C (39°F), drain all water from the pressure station.
Refer to Section
Содержание Druck PV 62X
Страница 1: ...Druck com PV 62X PV 62X IS Pneumatic Hydraulic Pressure Stations Instruction Manual...
Страница 2: ......
Страница 23: ......