Copyright 2022 Baker Hughes Company.
8 | DPI 610E Quick Start & Safety Manual–English
2.2.3 Generating Pressure
INFORMATION
Make sure the instrument is primed
before attempting to generate pressure.
Note:
Check instrument pressure range on rear label
before proceeding
2.3 Pneumatic Units
2.3.1 Venting to atmosphere
2.3.2 Attach Dirt and Moisture Trap
2.3.3 Remove a Dirt and Moisture Trap
2.3.4 Preparing for Pressure/Vacuum Operation
Step 1
After priming the
instrument, turn the
volume adjuster wheel
clockwise until the
required pressure is
achieved and allow the
pressure to settle.
Note:
If the required
pressure is not
achieved or not
stable, release the
pressure in the
instrument and
repeat the priming
sequence
.
To vent the system to atmospheric
pressure, slowly turn the pressure
release knob fully anti-clockwise until
the sensor returns to zero (gauge
sensor) or 1 bar (absolute sensor).
CAUTION
A rapid drop in
pressure can damage the
instrument. Open the pressure
release knob slowly and
monitor the pressure reading
until you reach the desired
pressure.
To attach a dirt and moisture trap to
the test port, screw the connector fully
anticlockwise until it is hand tight.
Make sure that the device under test
has a male G ⅜ Quickfit adapter
thread or use a suitable adapter rated
to 35 bar.
If in doubt, please contact:
sensing.grobycc@bakerhughe
s.com
INFORMATION
It is
recommended that the dirt trap
is used.
CAUTION
To avoid damage
to the dirt and moisture trap,
hold it firmly while screwing it
into the test port
Step 1
Release all of the pressure in
the instrument by opening the
pressure release knob fully anti-
clockwise.
Step 2
To remove the device under
test/dirt trap, unscrew the
connector by rotating it fully
clockwise.
CAUTION
To avoid
damage to the dirt and
moisture trap, hold it
firmly before attempting to
remove it.
Step 1
Power ON the
instrument by holding
down the power
button for 2 seconds
until the Druck splash
screen appears.
Step 2
Select the required
pressure function
from the Channel
Function screen.
From the dashboard
select:
CALIBRATOR >>
or
>>
FUNCTION
Step 3
Select the required
units.
From the dashboard
select:
CALIBRATOR >>
or
>>
UNITS
Step 4
Screw the device
under test into the test
port
When connecting
the device under
test, secure the
connector attached
to the instrument
.
Содержание Druck DPI 610E-PC
Страница 2: ......
Страница 4: ...Copyright 2022 Baker Hughes Company ii Quick Start Safety Manual 10 12 13 11 14 1 15 19 20 16 17 18...
Страница 6: ...Copyright 2022 Baker Hughes Company iv Quick Start Safety Manual...
Страница 16: ...Copyright 2022 Baker Hughes Company 10 DPI 610E Quick Start Safety Manual English...
Страница 26: ...Copyright 2022 Baker Hughes Company 20 DPI 610E Stru n n vod k uveden do provozu a bezpe nosti esky...
Страница 36: ...Copyright 2022 Baker Hughes Company 30 DPI 610E Start og sikkerhedsvejledning Dansk...
Страница 56: ...Copyright 2022 Baker Hughes Company 50 Manual de seguridad y gu a de inicio r pido del DPI 610E Espa ol...
Страница 96: ...Autorties bas 2022 Baker Hughes Company 90 DPI 610E tr s darba s k anas un dro bas rokasgr mata Latvie u...
Страница 106: ...Autori teis s priklauso Baker Hughes Company 2022 m 100 DPI 610E Greito pasirengimo darbui ir saugos vadovas Lietuvi k...
Страница 116: ...Copyright 2022 Baker Hughes Company 110 DPI 610E Quick Start Biztons gi k zik nyv Magyar...
Страница 144: ...Copyright 2022 Baker Hughes Company 138 DPI 610E Instrukcja dot bezpiecze stwa i kr tka instrukcja uruchamiania Polski...
Страница 154: ...Copyright 2022 Baker Hughes Company 148 DPI 610E Manual de in cio r pido e seguran a Portugu s...
Страница 164: ...Copyright 2022 Baker Hughes Company 158 DPI 610E Manual de pornire rapid i de siguran Rom n...
Страница 174: ...Copyright 2022 Baker Hughes Company 168 DPI 610E Quick Start Safety Manual Svenska...
Страница 184: ...Telif Hakk 2022 Baker Hughes Company 178 DPI 610E H zl Ba lang ve G venlik K lavuzu T rk e...
Страница 191: ...2022 Baker Hughes Company DPI 610E 185 5 CALIBRATOR UNITS 6 7 8 5 10 bar 9 10 5 10 bar 11 12 10 15 13 14...
Страница 199: ...Baker Hughes Company 2022 DPI 610E 193 2 30 2 2 2 2 1 100 3 2 2 2 1 2 3 75 4 1...
Страница 201: ...Baker Hughes Company 2022 DPI 610E 195 11 12 10 15 13 14 15 2 5 16 AMC 17 10 20...
Страница 204: ...Baker Hughes Company 2022 198 DPI 610E...
Страница 208: ...2022 Baker Hughes Company 202 DPI 610E 1 11 200 1 7 USB Micro B...
Страница 213: ...2022 Baker Hughes Company DPI 610E 207 2 3 5 2 4 DPI610E 2 2 5 2 6 2 6 1 2 6 2 2 7 3 x 3 2 8 2 9 1 2 3 4 LCD...
Страница 214: ...2022 Baker Hughes Company 208 DPI 610E...
Страница 220: ...Copyright 2022 Baker Hughes Company 214 DPI 610E 2 2 3 2 3 2 3 1 12 10 15 13 0 14 15 2 5 16 AMC 17 10 20bar 1 0 1bar...
Страница 231: ......