
19
19
DIE SELECTION AND INSTALLATION
Before any bending can take place, the
proper die set must be chosen to match the
material being bent. (EX) 1-
1/2” diameter
tubing requires a die set marked 1-
1/2”
tube.
A
Hook Arm
B
Bend Die
C
Hold down Bolts
D
Plastic Slide
E
Counter Die Mount
F
Bronze Counter Die Insert
G
“0” Mark
Note
: Pipe and Tube are not
the same, (see table 1) for nominal pipe
sizes. All BAILEIGH INDUSTRIAL dies are
color coded to avoid confusion between
pipe and tube (see table 2).
IMPORTANT:
Damaged or worn
tooling should be replaced before
attempting to bend material. This will
ensure that bends are correct and provide a longer life to machine components.
When handling large heavy dies and/or material, make sure it is properly lifted and supported.
1. To install the die, slip the die over the centering pin until the three unequally spaced drive
pins engage the receiving holes formed in the die.
Note
: The die will only fit one way.
2. When the drive pins line up the die will drop all the way down to the spindle.
3. Install and tighten the 1/2-13 socket head bolts provided with the die. Tighten these bolts
enough to hold the die firmly down to the spindle. Approximately 30-40ft-lb. (40-50N
•m).
IMPORTANT:
FAILURE TO PROPERLY BOLT DOWN DIE WILL RESULT IN
DAMAGE TO MACHINE AND TOOLING.
A
G
F
B
C
D
E
Содержание RDB-500
Страница 16: ...13 13 GETTING TO KNOW YOUR MACHINE A B C D E G H J F...
Страница 36: ...33 33 ELECTRICAL SCHEMATIC...
Страница 40: ...37 37 Diagram 1...
Страница 41: ...38 38 Diagram 2...
Страница 42: ...39 39 PARTS DIAGRAM Base Assembly Parts Diagram...
Страница 43: ...40 40 Main Tube Assembly Parts Diagram...
Страница 44: ...41 41 Swing Arm Assembly Parts Diagram...
Страница 45: ...42 42 Lead Screw Assembly Parts Diagram...
Страница 46: ...43 43 Encoder Assembly Parts Diagram...
Страница 47: ...44 44 Adaptor Plate Assembly Parts Diagram...