![Baileigh Industrial MB-4X2 Скачать руководство пользователя страница 20](http://html.mh-extra.com/html/baileigh-industrial/mb-4x2/mb-4x2_operators-manual_466951020.webp)
17
UNPACKING & CHECKING CONTENTS
1. Separate all contents from packing material; separate the machine and table from skids.
2. Move the machine and table to the desired area. Make sure area has plenty of work area
around the machine with ample lighting.
3. Check over parts carefully to ensure all parts are accounted for and undamaged.
4. Your machine is tested by our technicians before leaving our factory.
5. Inspect your machine again after it is operational. Please notify us if something is missing or
if damaged has occurred.
DIE STRUT ROD
CLAMP DIE
BEND DIE
WIPER DIE
PRESSURE DIE ASSEMBLY
PRESSURE DIE TOOLING
MANDREL ROD
PRESSSURE DIE ASSIST MANIFOLD
Содержание MB-4X2
Страница 16: ...13 OVERALL DIMENSIONS ...
Страница 17: ...14 ...
Страница 18: ...15 ...
Страница 19: ...16 ...
Страница 34: ...31 HYDRAULIC SCHEMATIC ...
Страница 36: ...33 ELECTRICAL SCHEMATIC ...
Страница 37: ...34 ...
Страница 38: ...35 ...
Страница 40: ...37 CART ASSEMBLY ...
Страница 41: ...38 MAIN FRAME ASSEMBLY ...
Страница 42: ...39 SPINDLE STACK ASSEMBLY ...
Страница 43: ...40 SWING ARM ASSEMBLY ...
Страница 44: ...41 MODIFIED PRESSURE DIE ASSEMBLY ...
Страница 45: ...42 STRUT BAR ASSEMBLY ...
Страница 46: ...43 ENCODER ASSEMBLY ...
Страница 47: ...44 MANDREL TABLE ASSEMBLY ...
Страница 48: ...45 MANDREL EXTRACTION CYLINDER ASSEMBLY ...
Страница 49: ...46 CONTROL BOX ASSEMBLY ...
Страница 56: ...53 ORIGINAL PRESSURE DIE PARTS DIAGRAM ...
Страница 58: ...55 NOTES ...
Страница 59: ...56 NOTES ...